Setup Data Streams Monitoring for Python

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Prerequisites

Supported libraries

TechnologyLibraryMinimal tracer versionRecommended tracer version
Kafkaconfluent-kafka1.16.02.11.0 or later
RabbitMQKombu2.6.02.6.0 or later
Amazon SQSBotocore1.20.02.8.0 or later
Amazon KinesisBotocore1.20.02.8.0 or later
Amazon SNSBotocore1.20.02.8.0 or later

Installation

Python uses auto-instrumentation to inject and extract additional metadata required by Data Streams Monitoring for measuring end-to-end latencies and the relationship between queues and services. To enable Data Streams Monitoring, set the DD_DATA_STREAMS_ENABLED environment variable to true on services sending messages to (or consuming messages from) Kafka.

For example:

environment:
  - DD_DATA_STREAMS_ENABLED: "true"

Monitoring Kafka Pipelines

Data Streams Monitoring uses message headers to propagate context through Kafka streams. If log.message.format.version is set in the Kafka broker configuration, it must be set to 0.11.0.0 or higher. Data Streams Monitoring is not supported for versions lower than this.

Monitoring SQS Pipelines

Data Streams Monitoring uses one message attribute to track a message’s path through an SQS queue. As Amazon SQS has a maximum limit of 10 message attributes allowed per message, all messages streamed through the data pipelines must have 9 or fewer message attributes set, allowing the remaining attribute for Data Streams Monitoring.

Monitoring Kinesis pipelines

There are no message attributes in Kinesis to propagate context and track a message’s full path through a Kinesis stream. As a result, Data Streams Monitoring’s end-to-end latency metrics are approximated based on summing latency on segments of a message’s path, from the producing service through a Kinesis Stream, to a consumer service. Throughput metrics are based on segments from the producing service through a Kinesis Stream, to the consumer service. The full topology of data streams can still be visualized through instrumenting services.

Monitoring SNS-to-SQS pipelines

To monitor a data pipeline where Amazon SNS talks directly to Amazon SQS, you must enable Amazon SNS raw message delivery.

Manual instrumentation

Data Streams Monitoring propagates context through message headers. If you are using a message queue technology that is not supported by DSM, a technology without headers (such as Kinesis), or Lambdas, use manual instrumentation to set up DSM.

Monitoring connectors

Confluent Cloud connectors

Data Streams Monitoring can automatically discover your Confluent Cloud connectors and visualize them within the context of your end-to-end streaming data pipeline.

Setup
  1. Install and configure the Datadog-Confluent Cloud integration.

  2. In Datadog, open the Confluent Cloud integration tile.

    The Confluent Cloud integration tile in Datadog, on the Configure tab. Under an Actions heading, a table titled '13 Resources autodiscovered' containing a list of resources and checkboxes for each resource.

    Under Actions, a list of resources populates with detected clusters and connectors. Datadog attempts to discover new connectors every time you view this integration tile.

  3. Select the resources you want to add.

  4. Click Add Resources.

  5. Navigate to Data Streams Monitoring to visualize the connectors and track connector status and throughput.

Further reading

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers