This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

aws_vpc_flow_log

account_id

Type: STRING

creation_time

Type: TIMESTAMP
Provider name: CreationTime
Description: The date and time the flow log was created.

deliver_cross_account_role

Type: STRING
Provider name: DeliverCrossAccountRole
Description: The ARN of the IAM role that allows the service to publish flow logs across accounts.

deliver_logs_error_message

Type: STRING
Provider name: DeliverLogsErrorMessage
Description: Information about the error that occurred. Rate limited indicates that CloudWatch Logs throttling has been applied for one or more network interfaces, or that you’ve reached the limit on the number of log groups that you can create. Access error indicates that the IAM role associated with the flow log does not have sufficient permissions to publish to CloudWatch Logs. Unknown error indicates an internal error.

deliver_logs_permission_arn

Type: STRING
Provider name: DeliverLogsPermissionArn
Description: The ARN of the IAM role allows the service to publish logs to CloudWatch Logs.

deliver_logs_status

Type: STRING
Provider name: DeliverLogsStatus
Description: The status of the logs delivery (SUCCESS | FAILED).

destination_options

Type: STRUCT
Provider name: DestinationOptions
Description: The destination options.

  • file_format
    Type: STRING
    Provider name: FileFormat
    Description: The format for the flow log.
  • hive_compatible_partitions
    Type: BOOLEAN
    Provider name: HiveCompatiblePartitions
    Description: Indicates whether to use Hive-compatible prefixes for flow logs stored in Amazon S3.
  • per_hour_partition
    Type: BOOLEAN
    Provider name: PerHourPartition
    Description: Indicates whether to partition the flow log per hour.

flow_log_arn

Type: STRING

flow_log_id

Type: STRING
Provider name: FlowLogId
Description: The ID of the flow log.

flow_log_status

Type: STRING
Provider name: FlowLogStatus
Description: The status of the flow log (ACTIVE).

log_destination

Type: STRING
Provider name: LogDestination
Description: The Amazon Resource Name (ARN) of the destination for the flow log data.

log_destination_type

Type: STRING
Provider name: LogDestinationType
Description: The type of destination for the flow log data.

log_format

Type: STRING
Provider name: LogFormat
Description: The format of the flow log record.

log_group_name

Type: STRING
Provider name: LogGroupName
Description: The name of the flow log group.

max_aggregation_interval

Type: INT32
Provider name: MaxAggregationInterval
Description: The maximum interval of time, in seconds, during which a flow of packets is captured and aggregated into a flow log record. When a network interface is attached to a Nitro-based instance, the aggregation interval is always 60 seconds (1 minute) or less, regardless of the specified value. Valid Values: 60 | 600

resource_id

Type: STRING
Provider name: ResourceId
Description: The ID of the resource being monitored.

tags

Type: UNORDERED_LIST_STRING

traffic_type

Type: STRING
Provider name: TrafficType
Description: The type of traffic captured for the flow log.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers