This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

azure_container_registry

admin_user_enabled

Type: BOOLEAN
Provider name: properties.adminUserEnabled
Description: The value that indicates whether the admin user is enabled.

creation_date

Type: STRING
Provider name: properties.creationDate
Description: The creation date of the container registry in ISO8601 format.

data_endpoint_enabled

Type: BOOLEAN
Provider name: properties.dataEndpointEnabled
Description: Enable a single data endpoint per region for serving data.

data_endpoint_host_names

Type: UNORDERED_LIST_STRING
Provider name: properties.dataEndpointHostNames
Description: List of host names that will serve data when dataEndpointEnabled is true.

encryption

Type: STRUCT
Provider name: properties.encryption
Description: The encryption settings of container registry.

  • key_vault_properties
    Type: STRUCT
    Provider name: keyVaultProperties
    Description: Key vault properties.
    • identity
      Type: STRING
      Provider name: identity
      Description: The client id of the identity which will be used to access key vault.
    • key_identifier
      Type: STRING
      Provider name: keyIdentifier
      Description: Key vault uri to access the encryption key.
    • key_rotation_enabled
      Type: BOOLEAN
      Provider name: keyRotationEnabled
      Description: Auto key rotation status for a CMK enabled registry.
    • last_key_rotation_timestamp
      Type: STRING
      Provider name: lastKeyRotationTimestamp
      Description: Timestamp of the last successful key rotation.
    • versioned_key_identifier
      Type: STRING
      Provider name: versionedKeyIdentifier
      Description: The fully qualified key identifier that includes the version of the key that is actually used for encryption.
  • status
    Type: STRING
    Provider name: status
    Description: Indicates whether or not the encryption is enabled for container registry.

id

Type: STRING
Provider name: id
Description: The resource ID.

identity

Type: STRUCT
Provider name: identity
Description: The identity of the container registry.

  • principal_id
    Type: STRING
    Provider name: principalId
    Description: The principal ID of resource identity.
  • tenant_id
    Type: STRING
    Provider name: tenantId
    Description: The tenant ID of resource.
  • type
    Type: STRING
    Provider name: type
    Description: The identity type.

location

Type: STRING
Provider name: location
Description: The location of the resource. This cannot be changed after the resource is created.

login_server

Type: STRING
Provider name: properties.loginServer
Description: The URL that can be used to log into the container registry.

name

Type: STRING
Provider name: name
Description: The name of the resource.

network_rule_bypass_options

Type: STRING
Provider name: properties.networkRuleBypassOptions
Description: Whether to allow trusted Azure services to access a network restricted registry.

network_rule_set

Type: STRUCT
Provider name: properties.networkRuleSet
Description: The network rule set for a container registry.

  • default_action
    Type: STRING
    Provider name: defaultAction
    Description: The default action of allow or deny when no other rules match.
  • ip_rules
    Type: UNORDERED_LIST_STRUCT
    Provider name: ipRules
    Description: The IP ACL rules.
    • action
      Type: STRING
      Provider name: action
      Description: The action of IP ACL rule.
    • value
      Type: STRING
      Provider name: value
      Description: Specifies the IP or IP range in CIDR format. Only IPV4 address is allowed.

policies

Type: STRUCT
Provider name: properties.policies
Description: The policies for a container registry.

  • export_policy
    Type: STRUCT
    Provider name: exportPolicy
    Description: The export policy for a container registry.
    • status
      Type: STRING
      Provider name: status
      Description: The value that indicates whether the policy is enabled or not.
  • quarantine_policy
    Type: STRUCT
    Provider name: quarantinePolicy
    Description: The quarantine policy for a container registry.
    • status
      Type: STRING
      Provider name: status
      Description: The value that indicates whether the policy is enabled or not.
  • retention_policy
    Type: STRUCT
    Provider name: retentionPolicy
    Description: The retention policy for a container registry.
    • days
      Type: INT32
      Provider name: days
      Description: The number of days to retain an untagged manifest after which it gets purged.
    • last_updated_time
      Type: STRING
      Provider name: lastUpdatedTime
      Description: The timestamp when the policy was last updated.
    • status
      Type: STRING
      Provider name: status
      Description: The value that indicates whether the policy is enabled or not.
  • trust_policy
    Type: STRUCT
    Provider name: trustPolicy
    Description: The content trust policy for a container registry.
    • status
      Type: STRING
      Provider name: status
      Description: The value that indicates whether the policy is enabled or not.
    • type
      Type: STRING
      Provider name: type
      Description: The type of trust policy.

private_endpoint_connections

Type: UNORDERED_LIST_STRUCT
Provider name: properties.privateEndpointConnections
Description: List of private endpoint connections for a container registry.

  • id
    Type: STRING
    Provider name: id
    Description: The resource ID.
  • name
    Type: STRING
    Provider name: name
    Description: The name of the resource.
  • private_endpoint
    Type: STRUCT
    Provider name: properties.privateEndpoint
    Description: The resource of private endpoint.
    • id
      Type: STRING
      Provider name: id
      Description: This is private endpoint resource created with Microsoft.Network resource provider.
  • private_link_service_connection_state
    Type: STRUCT
    Provider name: properties.privateLinkServiceConnectionState
    Description: A collection of information about the state of the connection between service consumer and provider.
    • actions_required
      Type: STRING
      Provider name: actionsRequired
      Description: A message indicating if changes on the service provider require any updates on the consumer.
    • description
      Type: STRING
      Provider name: description
      Description: The description for connection status. For example if connection is rejected it can indicate reason for rejection.
    • status
      Type: STRING
      Provider name: status
      Description: The private link service connection status.
  • provisioning_state
    Type: STRING
    Provider name: properties.provisioningState
    Description: The provisioning state of private endpoint connection resource.
  • system_data
    Type: STRUCT
    Provider name: systemData
    Description: Metadata pertaining to creation and last modification of the resource.
    • created_at
      Type: STRING
      Provider name: createdAt
      Description: The timestamp of resource creation (UTC).
    • created_by
      Type: STRING
      Provider name: createdBy
      Description: The identity that created the resource.
    • created_by_type
      Type: STRING
      Provider name: createdByType
      Description: The type of identity that created the resource.
    • last_modified_at
      Type: STRING
      Provider name: lastModifiedAt
      Description: The timestamp of resource modification (UTC).
    • last_modified_by
      Type: STRING
      Provider name: lastModifiedBy
      Description: The identity that last modified the resource.
    • last_modified_by_type
      Type: STRING
      Provider name: lastModifiedByType
      Description: The type of identity that last modified the resource.
  • type
    Type: STRING
    Provider name: type
    Description: The type of the resource.

provisioning_state

Type: STRING
Provider name: properties.provisioningState
Description: The provisioning state of the container registry at the time the operation was called.

public_network_access

Type: STRING
Provider name: properties.publicNetworkAccess
Description: Whether or not public network access is allowed for the container registry.

resource_group

Type: STRING

sku

Type: STRUCT
Provider name: sku
Description: The SKU of the container registry.

  • name
    Type: STRING
    Provider name: name
    Description: The SKU name of the container registry. Required for registry creation.
  • tier
    Type: STRING
    Provider name: tier
    Description: The SKU tier based on the SKU name.

status

Type: STRUCT
Provider name: properties.status
Description: The status of the container registry at the time the operation was called.

  • display_status
    Type: STRING
    Provider name: displayStatus
    Description: The short label for the status.
  • message
    Type: STRING
    Provider name: message
    Description: The detailed message for the status, including alerts and error messages.
  • timestamp
    Type: STRING
    Provider name: timestamp
    Description: The timestamp when the status was changed to the current value.

subscription_id

Type: STRING

subscription_name

Type: STRING

system_data

Type: STRUCT
Provider name: systemData
Description: Metadata pertaining to creation and last modification of the resource.

  • created_at
    Type: STRING
    Provider name: createdAt
    Description: The timestamp of resource creation (UTC).
  • created_by
    Type: STRING
    Provider name: createdBy
    Description: The identity that created the resource.
  • created_by_type
    Type: STRING
    Provider name: createdByType
    Description: The type of identity that created the resource.
  • last_modified_at
    Type: STRING
    Provider name: lastModifiedAt
    Description: The timestamp of resource modification (UTC).
  • last_modified_by
    Type: STRING
    Provider name: lastModifiedBy
    Description: The identity that last modified the resource.
  • last_modified_by_type
    Type: STRING
    Provider name: lastModifiedByType
    Description: The type of identity that last modified the resource.

tags

Type: UNORDERED_LIST_STRING

type

Type: STRING
Provider name: type
Description: The type of the resource.

zone_redundancy

Type: STRING
Provider name: properties.zoneRedundancy
Description: Whether or not zone redundancy is enabled for this container registry

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers