Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

azure_container_registry

admin_user_enabled

Type: BOOLEAN
Provider name: properties.adminUserEnabled
Description: The value that indicates whether the admin user is enabled.

creation_date

Type: STRING
Provider name: properties.creationDate
Description: The creation date of the container registry in ISO8601 format.

data_endpoint_enabled

Type: BOOLEAN
Provider name: properties.dataEndpointEnabled
Description: Enable a single data endpoint per region for serving data.

data_endpoint_host_names

Type: UNORDERED_LIST_STRING
Provider name: properties.dataEndpointHostNames
Description: List of host names that will serve data when dataEndpointEnabled is true.

encryption

Type: STRUCT
Provider name: properties.encryption
Description: The encryption settings of container registry.

  • key_vault_properties
    Type: STRUCT
    Provider name: keyVaultProperties
    Description: Key vault properties.
    • identity
      Type: STRING
      Provider name: identity
      Description: The client id of the identity which will be used to access key vault.
    • key_identifier
      Type: STRING
      Provider name: keyIdentifier
      Description: Key vault uri to access the encryption key.
    • key_rotation_enabled
      Type: BOOLEAN
      Provider name: keyRotationEnabled
      Description: Auto key rotation status for a CMK enabled registry.
    • last_key_rotation_timestamp
      Type: STRING
      Provider name: lastKeyRotationTimestamp
      Description: Timestamp of the last successful key rotation.
    • versioned_key_identifier
      Type: STRING
      Provider name: versionedKeyIdentifier
      Description: The fully qualified key identifier that includes the version of the key that is actually used for encryption.
  • status
    Type: STRING
    Provider name: status
    Description: Indicates whether or not the encryption is enabled for container registry.

id

Type: STRING
Provider name: id
Description: The resource ID.

identity

Type: STRUCT
Provider name: identity
Description: The identity of the container registry.

  • principal_id
    Type: STRING
    Provider name: principalId
    Description: The principal ID of resource identity.
  • tenant_id
    Type: STRING
    Provider name: tenantId
    Description: The tenant ID of resource.
  • type
    Type: STRING
    Provider name: type
    Description: The identity type.

location

Type: STRING
Provider name: location
Description: The location of the resource. This cannot be changed after the resource is created.

login_server

Type: STRING
Provider name: properties.loginServer
Description: The URL that can be used to log into the container registry.

name

Type: STRING
Provider name: name
Description: The name of the resource.

network_rule_bypass_options

Type: STRING
Provider name: properties.networkRuleBypassOptions
Description: Whether to allow trusted Azure services to access a network restricted registry.

network_rule_set

Type: STRUCT
Provider name: properties.networkRuleSet
Description: The network rule set for a container registry.

  • default_action
    Type: STRING
    Provider name: defaultAction
    Description: The default action of allow or deny when no other rules match.
  • ip_rules
    Type: UNORDERED_LIST_STRUCT
    Provider name: ipRules
    Description: The IP ACL rules.
    • action
      Type: STRING
      Provider name: action
      Description: The action of IP ACL rule.
    • value
      Type: STRING
      Provider name: value
      Description: Specifies the IP or IP range in CIDR format. Only IPV4 address is allowed.

policies

Type: STRUCT
Provider name: properties.policies
Description: The policies for a container registry.

  • export_policy
    Type: STRUCT
    Provider name: exportPolicy
    Description: The export policy for a container registry.
    • status
      Type: STRING
      Provider name: status
      Description: The value that indicates whether the policy is enabled or not.
  • quarantine_policy
    Type: STRUCT
    Provider name: quarantinePolicy
    Description: The quarantine policy for a container registry.
    • status
      Type: STRING
      Provider name: status
      Description: The value that indicates whether the policy is enabled or not.
  • retention_policy
    Type: STRUCT
    Provider name: retentionPolicy
    Description: The retention policy for a container registry.
    • days
      Type: INT32
      Provider name: days
      Description: The number of days to retain an untagged manifest after which it gets purged.
    • last_updated_time
      Type: STRING
      Provider name: lastUpdatedTime
      Description: The timestamp when the policy was last updated.
    • status
      Type: STRING
      Provider name: status
      Description: The value that indicates whether the policy is enabled or not.
  • trust_policy
    Type: STRUCT
    Provider name: trustPolicy
    Description: The content trust policy for a container registry.
    • status
      Type: STRING
      Provider name: status
      Description: The value that indicates whether the policy is enabled or not.
    • type
      Type: STRING
      Provider name: type
      Description: The type of trust policy.

private_endpoint_connections

Type: UNORDERED_LIST_STRUCT
Provider name: properties.privateEndpointConnections
Description: List of private endpoint connections for a container registry.

  • id
    Type: STRING
    Provider name: id
    Description: The resource ID.
  • name
    Type: STRING
    Provider name: name
    Description: The name of the resource.
  • private_endpoint
    Type: STRUCT
    Provider name: properties.privateEndpoint
    Description: The resource of private endpoint.
    • id
      Type: STRING
      Provider name: id
      Description: This is private endpoint resource created with Microsoft.Network resource provider.
  • private_link_service_connection_state
    Type: STRUCT
    Provider name: properties.privateLinkServiceConnectionState
    Description: A collection of information about the state of the connection between service consumer and provider.
    • actions_required
      Type: STRING
      Provider name: actionsRequired
      Description: A message indicating if changes on the service provider require any updates on the consumer.
    • description
      Type: STRING
      Provider name: description
      Description: The description for connection status. For example if connection is rejected it can indicate reason for rejection.
    • status
      Type: STRING
      Provider name: status
      Description: The private link service connection status.
  • provisioning_state
    Type: STRING
    Provider name: properties.provisioningState
    Description: The provisioning state of private endpoint connection resource.
  • system_data
    Type: STRUCT
    Provider name: systemData
    Description: Metadata pertaining to creation and last modification of the resource.
    • created_at
      Type: STRING
      Provider name: createdAt
      Description: The timestamp of resource creation (UTC).
    • created_by
      Type: STRING
      Provider name: createdBy
      Description: The identity that created the resource.
    • created_by_type
      Type: STRING
      Provider name: createdByType
      Description: The type of identity that created the resource.
    • last_modified_at
      Type: STRING
      Provider name: lastModifiedAt
      Description: The timestamp of resource modification (UTC).
    • last_modified_by
      Type: STRING
      Provider name: lastModifiedBy
      Description: The identity that last modified the resource.
    • last_modified_by_type
      Type: STRING
      Provider name: lastModifiedByType
      Description: The type of identity that last modified the resource.
  • type
    Type: STRING
    Provider name: type
    Description: The type of the resource.

provisioning_state

Type: STRING
Provider name: properties.provisioningState
Description: The provisioning state of the container registry at the time the operation was called.

public_network_access

Type: STRING
Provider name: properties.publicNetworkAccess
Description: Whether or not public network access is allowed for the container registry.

resource_group

Type: STRING

sku

Type: STRUCT
Provider name: sku
Description: The SKU of the container registry.

  • name
    Type: STRING
    Provider name: name
    Description: The SKU name of the container registry. Required for registry creation.
  • tier
    Type: STRING
    Provider name: tier
    Description: The SKU tier based on the SKU name.

status

Type: STRUCT
Provider name: properties.status
Description: The status of the container registry at the time the operation was called.

  • display_status
    Type: STRING
    Provider name: displayStatus
    Description: The short label for the status.
  • message
    Type: STRING
    Provider name: message
    Description: The detailed message for the status, including alerts and error messages.
  • timestamp
    Type: STRING
    Provider name: timestamp
    Description: The timestamp when the status was changed to the current value.

subscription_id

Type: STRING

subscription_name

Type: STRING

system_data

Type: STRUCT
Provider name: systemData
Description: Metadata pertaining to creation and last modification of the resource.

  • created_at
    Type: STRING
    Provider name: createdAt
    Description: The timestamp of resource creation (UTC).
  • created_by
    Type: STRING
    Provider name: createdBy
    Description: The identity that created the resource.
  • created_by_type
    Type: STRING
    Provider name: createdByType
    Description: The type of identity that created the resource.
  • last_modified_at
    Type: STRING
    Provider name: lastModifiedAt
    Description: The timestamp of resource modification (UTC).
  • last_modified_by
    Type: STRING
    Provider name: lastModifiedBy
    Description: The identity that last modified the resource.
  • last_modified_by_type
    Type: STRING
    Provider name: lastModifiedByType
    Description: The type of identity that last modified the resource.

tags

Type: UNORDERED_LIST_STRING

type

Type: STRING
Provider name: type
Description: The type of the resource.

zone_redundancy

Type: STRING
Provider name: properties.zoneRedundancy
Description: Whether or not zone redundancy is enabled for this container registry

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers