This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

azure_network_vnet

address_space

Type: STRUCT
Provider name: properties.addressSpace
Description: The AddressSpace that contains an array of IP address ranges that can be used by subnets.

  • address_prefixes
    Type: UNORDERED_LIST_STRING
    Provider name: addressPrefixes
    Description: A list of address blocks reserved for this virtual network in CIDR notation.

bgp_communities

Type: STRUCT
Provider name: properties.bgpCommunities
Description: Bgp Communities sent over ExpressRoute with each route corresponding to a prefix in this VNET.

  • regional_community
    Type: STRING
    Provider name: regionalCommunity
    Description: The BGP community associated with the region of the virtual network.
  • virtual_network_community
    Type: STRING
    Provider name: virtualNetworkCommunity
    Description: The BGP community associated with the virtual network.

dhcp_options

Type: STRUCT
Provider name: properties.dhcpOptions
Description: The dhcpOptions that contains an array of DNS servers available to VMs deployed in the virtual network.

  • dns_servers
    Type: UNORDERED_LIST_STRING
    Provider name: dnsServers
    Description: The list of DNS servers IP addresses.

enable_ddos_protection

Type: BOOLEAN
Provider name: properties.enableDdosProtection
Description: Indicates if DDoS protection is enabled for all the protected resources in the virtual network. It requires a DDoS protection plan associated with the resource.

enable_vm_protection

Type: BOOLEAN
Provider name: properties.enableVmProtection
Description: Indicates if VM protection is enabled for all the subnets in the virtual network.

encryption

Type: STRUCT
Provider name: properties.encryption
Description: Indicates if encryption is enabled on virtual network and if VM without encryption is allowed in encrypted VNet.

  • enabled
    Type: BOOLEAN
    Provider name: enabled
    Description: Indicates if encryption is enabled on the virtual network.
  • enforcement
    Type: STRING
    Provider name: enforcement
    Description: If the encrypted VNet allows VM that does not support encryption

etag

Type: STRING
Provider name: etag
Description: A unique read-only string that changes whenever the resource is updated.

extended_location

Type: STRUCT
Provider name: extendedLocation
Description: The extended location of the virtual network.

  • name
    Type: STRING
    Provider name: name
    Description: The name of the extended location.
  • type
    Type: STRING
    Provider name: type
    Description: The type of the extended location.

flow_timeout_in_minutes

Type: INT32
Provider name: properties.flowTimeoutInMinutes
Description: The FlowTimeout value (in minutes) for the Virtual Network

id

Type: STRING
Provider name: id
Description: Resource ID.

location

Type: STRING
Provider name: location
Description: Resource location.

name

Type: STRING
Provider name: name
Description: Resource name.

provisioning_state

Type: STRING
Provider name: properties.provisioningState
Description: The provisioning state of the virtual network resource.

resource_group

Type: STRING

resource_guid

Type: STRING
Provider name: properties.resourceGuid
Description: The resourceGuid property of the Virtual Network resource.

subscription_id

Type: STRING

subscription_name

Type: STRING

tags

Type: UNORDERED_LIST_STRING

type

Type: STRING
Provider name: type
Description: Resource type.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers