Amazon Elastic Block Store

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Overview

Amazon EBS provides persistent block storage volumes for use with Amazon EC2 instances in the AWS Cloud.

Enable this integration to see in Datadog all your EBS metrics.

Setup

Installation

If you haven’t already, set up the Amazon Web Services integration first.

Metric collection

  1. In the AWS integration page, ensure that EBS is enabled under the Metric Collection tab.
  2. Install the Datadog - Amazon EBS integration.

Note: This integration collects metrics for EBS volumes attached to a monitored EC2. To collect all EBS metrics, make sure that EC2 is checked in the AWS integration page and that the EC2 is not excluded from monitoring with the limit resource collection setting.

Log collection

Enable logging

Configure Amazon EBS to send logs either to a S3 bucket or to CloudWatch.

Note: If you log to a S3 bucket, make sure that amazon_ebs is set as Target prefix.

Send logs to Datadog

  1. If you haven’t already, set up the Datadog Forwarder Lambda function.

  2. Once the Lambda function is installed, manually add a trigger on the S3 bucket or CloudWatch log group that contains your Amazon EBS logs in the AWS console:

Data Collected

Metrics

aws.ebs.burst_balance
(gauge)
Balance available in the burst bucket. This metric contains values for all volume types including io1.
Shown as percent
aws.ebs.enable_copied_image_deprecation_completed
(count)
The number of cross-Region AMI copies that were marked for deprecation by an EBS-backed AMI policy.
aws.ebs.enable_copied_image_deprecation_failed
(count)
The number of cross-Region AMI copies that could not be marked for deprecation by an EBS-backed AMI policy.
aws.ebs.enable_image_deprecation_completed
(count)
The number of AMIs that were marked for deprecation by an EBS-backed AMI policy.
aws.ebs.enable_image_deprecation_failed
(count)
The number of AMIs that could not be marked for deprecation by an EBS-backed AMI policy.
aws.ebs.fast_snapshot_restore_credits_balance
(gauge)
The number of volume create credits available.
aws.ebs.fast_snapshot_restore_credits_bucket_size
(gauge)
The maximum number of volume create credits that can be accumulated.
aws.ebs.images_copied_region_completed
(count)
The number of cross-Region AMI copies created by an EBS-backed AMI policy.
aws.ebs.images_copied_region_deregister_completed
(count)
The number of cross-Region AMI copies deregistered, as designated by the retention rule, by an EBS-backed AMI policy.
aws.ebs.images_copied_region_deregister_failed
(count)
The number of cross-Region AMI copies that could not be deregistered, as designated by the retention rule, by an EBS-backed AMI policy.
aws.ebs.images_copied_region_failed
(count)
The number of cross-Region AMI copies that could not be created by an EBS-backed AMI policy.
aws.ebs.images_copied_region_started
(count)
The number of cross-Region copy actions initiated by an EBS-backed AMI policy.
aws.ebs.images_create_completed
(count)
The number of AMIs created by an EBS-backed AMI policy.
aws.ebs.images_create_failed
(count)
The number of AMIs that could not be created by an EBS-backed AMI policy.
aws.ebs.images_create_started
(count)
The number of CreateImage actions initiated by an EBS-backed AMI policy.
aws.ebs.images_deregister_completed
(count)
The number of AMIs deregistered by an EBS-backed AMI policy.
aws.ebs.images_deregister_failed
(count)
The number of AMIs that could not be deregistered by an EBS-backed AMI policy.
aws.ebs.post_script_completed
(count)
The number of instances for which a post script was successfully completed.
aws.ebs.post_script_failed
(count)
The number of instances for which a post script failed to complete successfully.
aws.ebs.post_script_started
(count)
The number of instances for which a post script was successfully initiated.
aws.ebs.pre_script_completed
(count)
The number of instances for which a pre script was successfully completed.
aws.ebs.pre_script_failed
(count)
The number of instances for which a pre script failed to complete successfully.
aws.ebs.pre_script_started
(count)
The number of instances for which a pre script was successfully initiated.
aws.ebs.resources_targeted
(count)
The number of resources targeted by the tags specified in a snapshot or EBS-backed AMI policy.
Shown as resource
aws.ebs.snapshots_archive_deletion_completed
(count)
The number of archived snapshots that were successfully deleted from the archive tier by a snapshot policy.
aws.ebs.snapshots_archive_deletion_failed
(count)
The number of archived snapshots that could not be deleted from the archive tier by a snapshot policy.
aws.ebs.snapshots_archive_scheduled
(count)
The number of snapshots that were scheduled to be archived by a snapshot policy.
aws.ebs.snapshots_copied_region_completed
(count)
The number of cross-Region snapshot copies created by a snapshot policy.
aws.ebs.snapshots_copied_region_delete_completed
(count)
The number of cross-Region snapshot copies deleted, as designated by the retention rule, by a snapshot policy.
aws.ebs.snapshots_copied_region_delete_failed
(count)
The number of cross-Region snapshot copies that could not be deleted, as designated by the retention rule, by a snapshot policy.
aws.ebs.snapshots_copied_region_failed
(count)
The number of cross-Region snapshot copies that could not be created by a snapshot policy.
aws.ebs.snapshots_copied_region_started
(count)
The number of cross-Region snapshot copy actions initiated by a snapshot policy.
aws.ebs.snapshots_create_completed
(count)
The number of snapshots created by a snapshot policy.
aws.ebs.snapshots_create_failed
(count)
The number of snapshots that could not be created by a snapshot policy.
aws.ebs.snapshots_create_started
(count)
The number of snapshot create actions initiated by a snapshot policy.
aws.ebs.snapshots_delete_completed
(count)
The number of snapshots deleted by a snapshot or EBS-backed AMI policy.
aws.ebs.snapshots_delete_failed
(count)
The number of snapshots that could not be deleted by a snapshot or EBS-backed AMI policy.
aws.ebs.snapshots_shared_completed
(count)
The number of snapshots shared across accounts by a snapshot policy.
aws.ebs.snapshots_shared_failed
(count)
The number of snapshots that could not be shared by a snapshot policy.
aws.ebs.volume_consumed_read_write_ops
(count)
The total amount of read and write operations (normalized to 256K capacity units). Only for io1 volume types.
aws.ebs.volume_consumed_read_write_ops.maximum
(count)
The maximum amount of read and write operations (normalized to 256K capacity units). Only for io1 volume types.
aws.ebs.volume_idle_time
(gauge)
The total number of seconds in a specified period of time when no read or write operations were submitted. This metric contains values for all volume types including io1.
Shown as second
aws.ebs.volume_queue_length
(gauge)
The number of read and write operation requests waiting to be completed. This metric contains values for all volume types including io1.
aws.ebs.volume_read_bytes
(gauge)
Average size of each read operation. This metric contains values for all volume types including io1.
Shown as byte
aws.ebs.volume_read_bytes.sum
(gauge)
Total number of bytes read by read operations. This metric contains values for all volume types including io1.
Shown as byte
aws.ebs.volume_read_ops
(count)
The total number of read operations. This metric contains values for all volume types including io1.
Shown as operation
aws.ebs.volume_read_ops.maximum
(count)
The maximum number of read operations for a volume (only for volumes attached to Nitro-based instances).
Shown as operation
aws.ebs.volume_throughput_percentage
(gauge)
The percentage of I/O operations per second (IOPS) delivered of the total IOPS provisioned for an Amazon EBS volume. Only for io1 volume types.
Shown as percent
aws.ebs.volume_total_read_time
(gauge)
The Average time spent by read operations. This metric contains values for all volume types including io1.
Shown as second
aws.ebs.volume_total_read_time.sum
(gauge)
The total number of seconds spent for read operations. This metric contains values for all volume types including io1.
Shown as second
aws.ebs.volume_stalled_io_check
(gauge)
Reports whether a volume has passed or failed a stalled IO check in the last minute. This metric can be either 0 (passed) or 1 (failed)
aws.ebs.volume_total_write_time
(gauge)
The average time spent by write operations. This metric contains values for all volume types including io1.
Shown as second
aws.ebs.volume_total_write_time.sum
(gauge)
The total number of seconds spent for write operations. This metric contains values for all volume types including io1.
Shown as second
aws.ebs.volume_write_bytes
(gauge)
Average size of each write operation. This metric contains values for all volume types including io1.
Shown as byte
aws.ebs.volume_write_bytes.sum
(gauge)
Total amount of bytes written by write operations. This metric contains values for all volume types including io1.
Shown as byte
aws.ebs.volume_write_ops
(count)
The total number of write operations. This metric contains values for all volume types including io1.
Shown as operation
aws.ebs.volume_write_ops.maximum
(count)
The maximum number of write operations for a volume (only for volumes attached to Nitro-based instances).
Shown as operation
aws.ebs.vss_backup_completed
(count)
The number of instances for which a VSS backup was successfully completed.
aws.ebs.vss_backup_failed
(count)
The number of instances for which a VSS backup failed to complete successfully.
aws.ebs.vss_backup_started
(count)
The number of instances for which a VSS backup was successfully initiated.
aws.ebs.burst_balance.io1
(gauge)
Balance available in the burst bucket. Better granularity but only for io1 volumes.
Shown as percent
aws.ebs.snapshot_age
(gauge)
Time since the most recent complete snapshot was created
Shown as second
aws.ebs.status.impaired
(gauge)
The number of EBS volumes with the impaired status.
aws.ebs.status.insufficient_data
(gauge)
The number of EBS volumes with the insufficient-data status.
aws.ebs.status.ok
(gauge)
The number of EBS volumes with the ok status.
aws.ebs.status.warning
(gauge)
The number of EBS volumes with the warning status.
aws.ebs.volume_idle_time.io1
(gauge)
The total number of seconds in a specified period of time when no read or write operations were submitted. Better granularity but only for io1 volumes.
Shown as second
aws.ebs.volume_queue_length.io1
(gauge)
The number of read and write operation requests waiting to be completed. Better granularity but only for io1 volumes.
aws.ebs.volume_read_bytes.io1
(gauge)
Average size of each read operation. Better granularity but only for io1 volumes.
Shown as byte
aws.ebs.volume_read_bytes.sum.io1
(gauge)
Total number of bytes read by read operations. Better granularity but only for io1 volumes.
Shown as byte
aws.ebs.volume_read_ops.io1
(count)
The total number of read operations. Better granularity but only for io1 volumes.
Shown as operation
aws.ebs.volume_total_read_time.io1
(gauge)
The Average time spent by read operations. Better granularity but only for io1 volumes.
Shown as second
aws.ebs.volume_total_read_time.sum.io1
(gauge)
The total number of seconds spent for read operations. Better granularity but only for io1 volumes.
Shown as second
aws.ebs.volume_total_write_time.io1
(gauge)
The average time spent by write operations. Better granularity but only for io1 volumes.
Shown as second
aws.ebs.volume_total_write_time.sum.io1
(gauge)
The total number of seconds spent for write operations. Better granularity but only for io1 volumes.
Shown as second
aws.ebs.volume_write_bytes.io1
(gauge)
Average size of each write operation. Better granularity but only for io1 volumes.
Shown as byte
aws.ebs.volume_write_bytes.sum.io1
(gauge)
Total amount of bytes written by write operations. Better granularity but only for io1 volumes.
Shown as byte
aws.ebs.volume_write_ops.io1
(count)
The total number of write operations. Better granularity but only for io1 volumes.
Shown as operation

Each of the metrics retrieved from AWS are assigned the same tags that appear in the AWS console, including but not limited to host name, security-groups, and more.

Events

The Amazon EBS integration does not include any events.

Service Checks

The Amazon EBS integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

Further Reading

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers