AWS Network Manager

Información general

AWS Network Manager es un servicio de monitorización centralizado para gestionar tu red central WAN en la nube de AWS y tu red de AWS Transit Gateway a través de cuentas, regiones y localizaciones on-premises de AWS.

Configuración

Instalación

Si aún no lo has hecho, configura primero la integración de Amazon Web Services.

Configuración

  1. En la página de integración de AWS, asegúrate de que Network Manager está activado en la pestaña Metric Collection (Recopilación de métricas).
  2. Instala la integración de Datadog y Amazon Network Manager.

Datos recopilados

Métricas

aws.ec2.infrastructureperformance.aggregate_aws_network_performance
(gauge)
The average latency between Regions, inter-Availability Zones, or intra-Availability Zones.
Shown as millisecond
aws.networkmanager.bytes_in
(count)
The number of bytes received by a resource.
Shown as byte
aws.networkmanager.bytes_out
(count)
The number of bytes sent from a resource.
Shown as byte
aws.networkmanager.packets_in
(count)
The number of packets received by a resource.
Shown as packet
aws.networkmanager.packets_out
(count)
The number of packets sent from a resource.
Shown as packet
aws.networkmanager.data_in
(count)
The number of bytes received by a resource.
Shown as byte
aws.networkmanager.data_out
(count)
The number of bytes sent from a resource.
Shown as byte
aws.networkmanager.tunnel_down_count
(gauge)
The number of VPN tunnels that have a DOWN status. Static VPN tunnels with a DOWN status, and BGP VPN tunnels with any state other than ESTABLISHED, are included in the count.
aws.networkmanager.bytes_drop_count_blackhole
(count)
The number of bytes dropped from a resource because it matched a blackhole route.
Shown as byte
aws.networkmanager.bytes_drop_count_no_route
(count)
The number of bytes dropped from a resource because it did not match a route.
Shown as byte
aws.networkmanager.packet_drop_count_blackhole
(count)
The number of packets dropped from a resource because it matched a blackhole route.
Shown as packet
aws.networkmanager.packet_drop_count_no_route
(count)
The number of packets dropped from a resource because it did not match a route.
Shown as packet

Checks de servicio

Amazon Network Manager no incluye ningún check de servicio.

Eventos

Amazon Network Manager no incluye ningún evento.

Solucionar problemas

¿Necesitas ayuda? Ponte en contacto con el servicio de asistencia de Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers