Amazon CloudWatch Network Monitor

Información general

Amazon CloudWatch Network Monitor es un servicio que proporciona administración centralizada y monitorización para redes globales en AWS u on-premises.

Habilita esta integración para obtener visibilidad de las métricas en Amazon CloudWatch Network Monitor.

Configuración

Instalación

Si aún no lo has hecho, configura la integración de Amazon Web Services.

Recopilación de métricas

Instala la integración de Datadog y CloudWatch Network Monitor.

Datos recopilados

Métricas

aws.networkmonitor.rtt
(gauge)
The time (in microseconds) for a network request to go from the source to its destination and back.
Shown as microsecond
aws.networkmonitor.packet_loss
(gauge)
The percentage of packets sent by the source which have not received replies before a static timeout is reached.
Shown as percent
aws.networkmonitor.health_indicator
(gauge)
Indicates the health of the AWS network. A value of 0 represents a healthy network, and a value of 100 represents degradation.

Eventos

La integración de CloudWatch Network Monitor no incluye ningún evento.

Checks de servicio

La integración de CloudWatch Network Monitor no incluye ningún check de servicio.

Solucionar problemas

¿Necesitas ayuda? Ponte en contacto con el soporte de Datadog.

Referencias adicionales

Más enlaces, artículos y documentación útiles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers