Microsoft Azure Firewall

Información general

Azure Firewall es una seguridad de red nativa de la nube que se utiliza para proteger tus recursos de Azure Virtual Network.

Utiliza la integración de Azure con Datadog para recopilar métricas de Firewall.

Configuración

Instalación

Si aún no lo has hecho, configura primero Microsoft Azure integración. No hay otros pasos de instalación.

Datos recopilados

Métricas

azure.network_azurefirewalls.application_rule_hit
(count)
The number of times application rules were hit
Shown as hit
azure.network_azurefirewalls.count
(count)
The number of Azure firewalls
azure.network_azurefirewalls.data_processed
(gauge)
The total amount of data processed by a firewall
Shown as byte
azure.network_azurefirewalls.firewall_health
(gauge)
Indicates the overall health of a firewall
Shown as percent
azure.network_azurefirewalls.network_rule_hit
(count)
The number of times network rules were hit
Shown as hit
azure.network_azurefirewalls.snat_port_utilization
(gauge)
The percentage of outbound SNAT ports currently in use
Shown as percent
azure.network_azurefirewalls.throughput
(gauge)
The throughput processed by a firewall
Shown as bit

Eventos

La integración Azure Firewall no incluye eventos.

Checks de servicio

La integración de Azure Firewall no incluye ningún check de servicio.

Solucionar problemas

¿Necesitas ayuda? Ponte en contacto con el soporte de Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers