Microsoft Azure Queue Storage

Información general

Azure Queue Storage es un servicio para almacenar grandes cantidades de mensajes a los que se puede acceder desde cualquier parte del mundo con llamadas autenticadas mediante HTTP o HTTPS.

Obtén métricas de Azure Queue Storage para:

  • Visualizar el rendimiento de tu Queue Storage.
  • Correlacionar el rendimiento de tu Queue Storage con tus aplicaciones.

Configuración

Instalación

Si aún no lo has hecho, configura la integración Microsoft Azure. No es necesario realizar ningún otro paso de instalación.

Datos recopilados

Métricas

azure.storage_storageaccounts_queueservices.availability
(gauge)
Percentage of availability for the storage service or the specified API operation. Availability is calculated by taking the TotalBillableRequests value and dividing it by the number of applicable requests, including those that produced unexpected errors. All unexpected errors result in reduced availability for the storage service or the specified API operation.
Shown as percent
azure.storage_storageaccounts_queueservices.egress
(count)
Amount of egress data. This number includes egress to external clients from Azure Storage as well as egress within Azure. As a result, this number does not reflect billable egress.
Shown as byte
azure.storage_storageaccounts_queueservices.ingress
(count)
Amount of ingress data, in bytes. This number includes ingress from an external client into Azure Storage as well as ingress within Azure.
Shown as byte
azure.storage_storageaccounts_queueservices.queue_capacity
(gauge)
Amount of queue storage used by the storage account.
Shown as byte
azure.storage_storageaccounts_queueservices.queue_count
(gauge)
Number of queues in the storage account.
azure.storage_storageaccounts_queueservices.queue_message_count
(gauge)
Number of unexpired queue messages in the storage account.
azure.storage_storageaccounts_queueservices.success_e2_e_latency
(gauge)
Average end-to-end latency of successful requests made to a storage service or the specified API operation, in milliseconds. This value includes the required processing time within Azure Storage to read the request, send the response, and receive acknowledgment of the response.
Shown as millisecond
azure.storage_storageaccounts_queueservices.success_server_latency
(gauge)
Average time used to process a successful request by Azure Storage. This value does not include the network latency specified in SuccessE2ELatency.
Shown as millisecond
azure.storage_storageaccounts_queueservices.transactions
(count)
Number of requests made to a storage service or the specified API operation. This number includes successful and failed requests, as well as requests which produced errors. Use the ResponseType dimension for the number of different types of responses.
azure.storage_storageaccounts_queueservices.count
(gauge)
Count of Storage storageAccounts queueServices.

Eventos

La integración Azure Queue Storage no incluye eventos.

Checks de servicio

La integración Azure Queue Storage no incluye checks de servicio.

Solucionar problemas

¿Necesitas ayuda? Ponte en contacto con el servicio de asistencia de Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers