This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Overview

Oracle Cloud Infrastructure (OCI) Virtual Cloud Networks (VCNs) are private, flexible data centers in the cloud with security policies and built-in administration and troubleshooting.

This integration allows you to monitor the performance, throughput, and health of your VCNs by collecting metrics and tags from the oci_vcn namespace.

Setup

Installation

After you set up the Oracle Cloud Infrastructure integration, ensure that the oci_vcn namespace is included in your Connector Hub.

Data Collected

Metrics

oci.vcn.smartnic_buffer_drops_from_host
(count)
Number of packets dropped in SmartNIC from host due to buffer exhaustion.
Shown as packet
oci.vcn.smartnic_buffer_drops_from_network
(count)
Number of packets dropped in SmartNIC from network due to buffer exhaustion.
Shown as packet
oci.vcn.vnic_conntrack_is_full
(gauge)
Boolean (0/false, 1/true) that indicates the connection tracking table is full.
oci.vcn.vnic_conntrack_util_percent
(gauge)
Total utilization percentage (0-100%) of the connection tracking table.
Shown as percent
oci.vcn.vnic_egress_drops_conntrack_full
(count)
Packets sent from the VNIC, destined for the network, dropped due to full connection tracking table.
Shown as packet
oci.vcn.vnic_egress_drops_security_list
(count)
Packets sent by the VNIC, destined for the network, dropped due to security rule violations.
Shown as packet
oci.vcn.vnic_egress_drops_throttle
(count)
Packets sent from the VNIC, destined for the network, dropped due to throttling.
Shown as packet
oci.vcn.vnic_from_network_bytes
(count)
Bytes received at the VNIC from the network, after drops.
Shown as byte
oci.vcn.vnic_from_network_packets
(count)
Packets received at the VNIC from the network, after drops.
Shown as packet
oci.vcn.vnic_ingress_drops_conntrack_full
(count)
Packets received from the network, destined for the VNIC, dropped due to full connection tracking table.
Shown as packet
oci.vcn.vnic_ingress_drops_security_list
(count)
Packets received from the network, destined for the VNIC, dropped due to security rule violations.
Shown as packet
oci.vcn.vnic_ingress_drops_throttle
(count)
Packets received from the network, destined for the VNIC, dropped due to throttling.
Shown as packet
oci.vcn.vnic_to_network_bytes
(count)
Bytes sent from the VNIC to the network, before drops.
Shown as byte
oci.vcn.vnic_to_network_packets
(count)
Packets sent from the VNIC to the network, before drops.
Shown as packet

Events

The OCI VCN integration does not include any events.

Service Checks

The OCI VCN integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers