This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

The quota processor measures the logging traffic for logs that match the filter you specify. When the configured daily quota is met inside the 24-hour rolling window, the processor can either drop additional logs or send an alert using a Datadog monitor. You can configure the processor to track the total volume or the total number of events. The pipeline uses the name of the quota to identify the quota across multiple Remote Configuration deployments of the Worker.

As an example, you can configure this processor to drop new logs or trigger an alert without dropping logs after the processor has received 10 million events from a certain service in the last 24 hours.

To set up the quota processor:

  1. Enter a name for the quota processor.
  2. Define a filter query. Only logs that match the specified filter query are counted towards the daily limit.
    • Logs that match the quota filter and are within the daily quota are sent to the next step in the pipeline.
    • Logs that do not match the quota filter are sent to the next step of the pipeline.
  3. In the Unit for quota dropdown menu, select if you want to measure the quota by the number of Events or by the Volume in bytes.
  4. Set the daily quota limit and select the unit of magnitude for your desired quota.
  5. Check the Drop events checkbox if you want to drop all events when your quota is met. Leave it unchecked if you plan to set up a monitor that sends an alert when the quota is met.
    • If logs that match the quota filter are received after the daily quota has been met and the Drop events option is selected, then those logs are dropped. In this case, only logs that did not match the filter query are sent to the next step in the pipeline.
    • If logs that match the quota filter are received after the daily quota has been met and the Drop events option is not selected, then those logs and the logs that did not match the filter query are sent to the next step in the pipeline.
  6. Optional: Click Add Field if you want to set a quota on a specific service or region field.
    a. Enter the field name you want to partition by. See the Partition example for more information.
    i. Select the Ignore when missing if you want the quota applied only to events that match the partition. See the Ignore when missing example for more information.
    ii. Optional: Click Overrides if you want to set different quotas for the partitioned field.
    - Click Download as CSV for an example of how to structure the CSV.
    - Drag and drop your overrides CSV to upload it. You can also click Browse to select the file to upload it. See the Overrides example for more information.
    b. Click Add Field if you want to add another partition.

Examples

Partition example

Use Partition by if you want to set a quota on a specific service or region. For example, if you want to set a quota for 10 events per day and group the events by the service field, enter service into the Partition by field.

Example for the “ignore when missing” option

Select Ignore when missing if you want the quota applied only to events that match the partition. For example, if the Worker receives the following set of events:

{"service":"a", "source":"foo", "message": "..."}
{"service":"b", "source":"bar", "message": "..."}
{"service":"b", "message": "..."}
{"source":"redis", "message": "..."}
{"message": "..."}

And the Ignore when missing is selected, then the Worker:

  • creates a set for logs with service:a and source:foo
  • creates a set for logs with service:b and source:bar
  • ignores the last three events

The quota is applied to the two sets of logs and not to the last three events.

If the Ignore when missing is not selected, the quota is applied to all five events.

Overrides example

If you are partitioning by service and have two services: a and b, you can use overrides to apply different quotas for them. For example, if you want service:a to have a quota limit of 5,000 bytes and service:b to have a limit of 50 events, the override rules look like this:

ServiceTypeLimit
aBytes5,000
bEvents50

Sintaxis de las consultas de filtro

Cada procesador tiene una consulta de filtro correspondiente en sus campos. Los procesadores sólo procesan los logs que coinciden con su consulta de filtro. Y en todos los procesadores, excepto el procesador de filtro, los logs que no coinciden con la consulta se envían al siguiente paso de la cadena. Para el procesador de filtro, los logs que no coinciden con la consulta se descartan.

Para cualquier atributo, etiqueta (tag) o par key:value que no sea un atributo reservado, la consulta debe empezar por @. Por el contrario, para filtrar atributos reservados, no es necesario añadir @ delante de la consulta de filtro.

Por ejemplo, para filtrar y descartar logs status:info, tu filtro puede definirse como NOT (status:info). Para filtrar y descartar system-status:info, el filtro debe ser NOT (@system-status:info).

Ejemplos de consulta de filtro:

  • NOT (status:debug): Esto filtra sólo los logs que no tienen el estado DEBUG.
  • status:ok service:flask-web-app: Esto filtra todos los logs con el estado OK de tu servicioflask-web-app.
    • Esta consulta también se puede escribir como: status:ok AND service:flask-web-app.
  • host:COMP-A9JNGYK OR host:COMP-J58KAS: Esta consulta de filtro sólo coincide con los logs de hosts etiquetados.
  • @user.status:inactive: Esto filtra los logs con el estado inactive anidado bajo el atributo user.

Las consultas ejecutadas en el worker de Observability Pipelines distinguen entre mayúsculas y minúsculas. Obtén más información sobre cómo escribir consultas de filtro con la sintaxis de búsqueda de logs de Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers