This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Datadog AAP Threat Management and Code Security are built on top of APM. While Datadog recommends using these security products with APM and adopting DevSecOps practices, you can also use these security products without using APM. This configuration is referred to as Standalone Application Security. This guide explains how to set up Standalone Application Security.

Prerequisites

This guide assumes you have the following:

  • Datadog Agent: Install the Datadog Agent and configure it for your application’s operating system, container, cloud, or virtual environment.
  • Supported Tracing Library: The Datadog Tracing Library used by your application or service supports application security. For more details, see the guides for Application Threat Management or Code Security.

Compatibility

Standalone Application Security is currently supported for the following tracing library versions:

LanguageVersion
.NET3.12.0
GoN/A
Java1.47.0
Node.js5.40.0
PHPN/A
Python3.2.0
Ruby2.13.0

Setup

Set up the Datadog Agent using the standard method for APM or Application Security setup, but set up the Tracing Library by adding the DD_APM_TRACING_ENABLED=false environment variable to the service that runs the Tracing Library.

This environment variable will reduce the amount of APM data sent to Datadog to the minimum required by Application Security products. The environment variable can then be combined with environment variables to enable AAP Threat Management or Code Security.

For AAP Threat Management, add the DD_APM_TRACING_ENABLED=false DD_APPSEC_ENABLED=true environment variable.

For Code Security, add the DD_APM_TRACING_ENABLED=false DD_IAST_ENABLED=true environment variable.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers