Auto Scaling groups associated with a Classic Load Balancer should use ELB health checks

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

This check verifies if Auto Scaling groups linked to a Classic Load Balancer are using health checks from Elastic Load Balancing (ELB).

The check confirms that the group evaluates the health of its instances using the extended checks available via the load balancer. Employing ELB health checks, rather than EC2, on Classic Load Balancers, can enhance the reliability of applications deployed with EC2 Auto Scaling groups.

Remediation

For instructions on implementing Elastic Load Balancing health checks, refer to the Add Elastic Load Balancing health checks section in the Amazon EC2 Auto Scaling User Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers