Classic Load Balancers should span multiple Availability Zones

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

This check ensures Classic Load Balancers are configured to operate across at least two Availability Zones (AZs). Load balancers can be set up to distribute traffic across Amazon EC2 instances within either a single Availability Zone or multiple Availability Zones. If a load balancer is not configured to span multiple Availability Zones, it cannot redirect traffic to targets in a different Availability Zone if the sole configured AZ becomes unavailable.

Remediation

To add Availability Zones to a Classic Load Balancer, see Add or remove subnets for your Classic Load Balancer.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers