Server parameter 'log_disconnections' should be enabled for PostgreSQL Database Server

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

Enabling log_disconnections helps PostgreSQL Database to log the end of a session, including duration, which in turn generates query and error logs. Query and error logs can be used to identify, troubleshoot, and repair configuration errors and sub-optimal performance.

Remediation

From the console

  1. Log in to Azure Portal.
  2. Go to Azure Database for PostgreSQL server.
  3. For each database, click Server parameters.
  4. Search for log_disconnections.
  5. Click ON and save.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers