RBAC should be enabled for the Kubernetes API server

Set up the kubernetes integration.

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

Role Based Access Control (RBAC) should be enabled. RBAC allows fine-grained control over the operations that different entities can perform on different objects in the cluster.

Remediation

Edit the API server pod specification file /etc/kubernetes/manifests/kube-apiserver.yaml on the master node, and set the --authorization-mode parameter to a value that includes RBAC. For example, --authorization-mode=Node,RBAC.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers