Ensure PAM Enforces Password Requirements - Minimum Length

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

The pam_pwquality module’s minlen parameter controls requirements for minimum characters required in a password. Add minlen=14 after pam_pwquality to set minimum password length requirements.

Rationale

The shorter the password, the lower the number of possible combinations that need to be tested before the password is compromised.

Password complexity, or strength, is a measure of the effectiveness of a password in resisting attempts at guessing and brute-force attacks. Password length is one factor of several that helps to determine strength and how long it takes to crack a password. Use of more characters in a password helps to exponentially increase the time and/or resources required to compromise the password.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}\n' 'libpam-runtime' 2>/dev/null | grep -q installed; then

var_password_pam_minlen='14'






# Strip any search characters in the key arg so that the key can be replaced without
# adding any search characters to the config file.
stripped_key=$(sed 's/[\^=\$,;+]*//g' <<< "^minlen")

# shellcheck disable=SC2059
printf -v formatted_output "%s = %s" "$stripped_key" "$var_password_pam_minlen"

# If the key exists, change it. Otherwise, add it to the config_file.
# We search for the key string followed by a word boundary (matched by \>),
# so if we search for 'setting', 'setting2' won't match.
if LC_ALL=C grep -q -m 1 -i -e "^minlen\\>" "/etc/security/pwquality.conf"; then
    escaped_formatted_output=$(sed -e 's|/|\\/|g' <<< "$formatted_output")
    LC_ALL=C sed -i --follow-symlinks "s/^minlen\\>.*/$escaped_formatted_output/gi" "/etc/security/pwquality.conf"
else
    if [[ -s "/etc/security/pwquality.conf" ]] && [[ -n "$(tail -c 1 -- "/etc/security/pwquality.conf" || true)" ]]; then
        LC_ALL=C sed -i --follow-symlinks '$a'\\ "/etc/security/pwquality.conf"
    fi
    printf '%s\n' "$formatted_output" >> "/etc/security/pwquality.conf"
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - CJIS-5.6.2.1.1
  - DISA-STIG-UBTU-20-010054
  - NIST-800-53-CM-6(a)
  - NIST-800-53-IA-5(1)(a)
  - NIST-800-53-IA-5(4)
  - NIST-800-53-IA-5(c)
  - PCI-DSS-Req-8.2.3
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.6
  - accounts_password_pam_minlen
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
- name: XCCDF Value var_password_pam_minlen # promote to variable
  set_fact:
    var_password_pam_minlen: !!str 14
  tags:
    - always

- name: Ensure PAM Enforces Password Requirements - Minimum Length - Ensure PAM variable
    minlen is set accordingly
  ansible.builtin.lineinfile:
    create: true
    dest: /etc/security/pwquality.conf
    regexp: ^#?\s*minlen
    line: minlen = {{ var_password_pam_minlen }}
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - CJIS-5.6.2.1.1
  - DISA-STIG-UBTU-20-010054
  - NIST-800-53-CM-6(a)
  - NIST-800-53-IA-5(1)(a)
  - NIST-800-53-IA-5(4)
  - NIST-800-53-IA-5(c)
  - PCI-DSS-Req-8.2.3
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.6
  - accounts_password_pam_minlen
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers