Ensure PAM Enforces Password Requirements - Authentication Retry Prompts Permitted Per-Session

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

To configure the number of retry prompts that are permitted per-session: Edit the pam_pwquality.so statement in /etc/pam.d/common-password to show retry=3, or a lower value if site policy is more restrictive. The DoD requirement is a maximum of 3 prompts per session.

Rationale

Setting the password retry prompts that are permitted on a per-session basis to a low value requires some software, such as SSH, to re-connect. This can slow down and draw additional attention to some types of password-guessing attacks. Note that this is different from account lockout, which is provided by the pam_faillock module.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}\n' 'libpam-runtime' 2>/dev/null | grep -q installed; then

var_password_pam_retry='3'


if [ -e "/etc/pam.d/common-password" ] ; then
    valueRegex="$var_password_pam_retry" defaultValue="$var_password_pam_retry"
    # non-empty values need to be preceded by an equals sign
    [ -n "${valueRegex}" ] && valueRegex="=${valueRegex}"
    # add an equals sign to non-empty values
    [ -n "${defaultValue}" ] && defaultValue="=${defaultValue}"

    # fix 'type' if it's wrong
    if grep -q -P "^\\s*(?"'!'"password\\s)[[:alnum:]]+\\s+[[:alnum:]]+\\s+pam_pwquality.so" < "/etc/pam.d/common-password" ; then
        sed --follow-symlinks -i -E -e "s/^(\\s*)[[:alnum:]]+(\\s+[[:alnum:]]+\\s+pam_pwquality.so)/\\1password\\2/" "/etc/pam.d/common-password"
    fi

    # fix 'control' if it's wrong
    if grep -q -P "^\\s*password\\s+(?"'!'"requisite)[[:alnum:]]+\\s+pam_pwquality.so" < "/etc/pam.d/common-password" ; then
        sed --follow-symlinks -i -E -e "s/^(\\s*password\\s+)[[:alnum:]]+(\\s+pam_pwquality.so)/\\1requisite\\2/" "/etc/pam.d/common-password"
    fi

    # fix the value for 'option' if one exists but does not match 'valueRegex'
    if grep -q -P "^\\s*password\\s+requisite\\s+pam_pwquality.so(\\s.+)?\\s+retry(?"'!'"${valueRegex}(\\s|\$))" < "/etc/pam.d/common-password" ; then
        sed --follow-symlinks -i -E -e "s/^(\\s*password\\s+requisite\\s+pam_pwquality.so(\\s.+)?\\s)retry=[^[:space:]]*/\\1retry${defaultValue}/" "/etc/pam.d/common-password"

    # add 'option=default' if option is not set
    elif grep -q -E "^\\s*password\\s+requisite\\s+pam_pwquality.so" < "/etc/pam.d/common-password" &&
            grep    -E "^\\s*password\\s+requisite\\s+pam_pwquality.so" < "/etc/pam.d/common-password" | grep -q -E -v "\\sretry(=|\\s|\$)" ; then

        sed --follow-symlinks -i -E -e "s/^(\\s*password\\s+requisite\\s+pam_pwquality.so[^\\n]*)/\\1 retry${defaultValue}/" "/etc/pam.d/common-password"
    # add a new entry if none exists
    elif ! grep -q -P "^\\s*password\\s+requisite\\s+pam_pwquality.so(\\s.+)?\\s+retry${valueRegex}(\\s|\$)" < "/etc/pam.d/common-password" ; then
        echo "password requisite pam_pwquality.so retry${defaultValue}" >> "/etc/pam.d/common-password"
    fi
else
    echo "/etc/pam.d/common-password doesn't exist" >&2
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers