Set Lockout Time for Failed Password Attempts

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

This rule configures the system to lock out accounts during a specified time period after a number of incorrect login attempts using pam_faillock.so. Ensure that the file /etc/security/faillock.conf contains the following entry: unlock_time=<interval-in-seconds> where interval-in-seconds is 0 or greater. pam_faillock.so module requires multiple entries in pam files. These entries must be carefully defined to work as expected. In order to avoid any errors when manually editing these files, it is recommended to use the appropriate tools, such as authselect or authconfig, depending on the OS version. If unlock_time is set to 0, manual intervention by an administrator is required to unlock a user. This should be done using the faillock tool.

Rationale

By limiting the number of failed logon attempts the risk of unauthorized system access via user password guessing, otherwise known as brute-forcing, is reduced. Limits are imposed by locking the account.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}\n' 'libpam-runtime' 2>/dev/null | grep -q installed; then

var_accounts_passwords_pam_faillock_unlock_time='0'


if [ -f /usr/bin/authselect ]; then
    if ! authselect check; then
echo "
authselect integrity check failed. Remediation aborted!
This remediation could not be applied because an authselect profile was not selected or the selected profile is not intact.
It is not recommended to manually edit the PAM files when authselect tool is available.
In cases where the default authselect profile does not cover a specific demand, a custom authselect profile is recommended."
exit 1
fi
authselect enable-feature with-faillock

authselect apply-changes -b
else
    
pam_file="/etc/pam.d/common-auth"
if ! grep -qE '^\s*auth\s+required\s+pam_faillock\.so\s+preauth.*$' "$pam_file" ; then
    # insert at the top
    sed -i --follow-symlinks '/^# here are the per-package modules/i auth        required      pam_faillock.so preauth' "$pam_file"
fi
if ! grep -qE '^\s*auth\s+\[default=die\]\s+pam_faillock\.so\s+authfail.*$' "$pam_file" ; then

    num_lines=$(sed -n 's/^\s*auth.*success=\([1-9]\).*pam_unix\.so.*/\1/p' "$pam_file")
    if [ ! -z "$num_lines" ]; then

        # Add pam_faillock (authfail) module below pam_unix, skipping N-1 lines, where N is
        # the number of jumps in the pam_unix success=N statement. Ignore commented and empty lines.

        append_position=$(cat -n "${pam_file}" \
                          | grep -P "^\s+\d+\s+auth\s+.*$" \
                          | grep -w "pam_unix.so" -A $(( num_lines - 1 )) \
                          | tail -n 1 | cut -f 1 | tr -d ' '
                         )
        sed -i --follow-symlinks ''${append_position}'a auth        [default=die]      pam_faillock.so authfail' "$pam_file"
    else
        sed -i --follow-symlinks '/^auth.*pam_unix\.so.*/a auth        [default=die]      pam_faillock.so authfail' "$pam_file"
    fi
fi
if ! grep -qE '^\s*auth\s+sufficient\s+pam_faillock\.so\s+authsucc.*$' "$pam_file" ; then
    sed -i --follow-symlinks '/^auth.*pam_faillock\.so.*authfail.*/a auth        sufficient      pam_faillock.so authsucc' "$pam_file"
fi

pam_file="/etc/pam.d/common-account"
if ! grep -qE '^\s*account\s+required\s+pam_faillock\.so.*$' "$pam_file" ; then
    echo 'account   required     pam_faillock.so' >> "$pam_file"
fi

fi

AUTH_FILES=("/etc/pam.d/common-auth")

FAILLOCK_CONF="/etc/security/faillock.conf"
if [ -f $FAILLOCK_CONF ]; then
    regex="^\s*unlock_time\s*="
    line="unlock_time = $var_accounts_passwords_pam_faillock_unlock_time"
    if ! grep -q $regex $FAILLOCK_CONF; then
        echo $line >> $FAILLOCK_CONF
    else
        sed -i --follow-symlinks 's|^\s*\(unlock_time\s*=\s*\)\(\S\+\)|\1'"$var_accounts_passwords_pam_faillock_unlock_time"'|g' $FAILLOCK_CONF
    fi
    for pam_file in "${AUTH_FILES[@]}"
    do
        if [ -e "$pam_file" ] ; then
            PAM_FILE_PATH="$pam_file"
            if [ -f /usr/bin/authselect ]; then
                
                if ! authselect check; then
                echo "
                authselect integrity check failed. Remediation aborted!
                This remediation could not be applied because an authselect profile was not selected or the selected profile is not intact.
                It is not recommended to manually edit the PAM files when authselect tool is available.
                In cases where the default authselect profile does not cover a specific demand, a custom authselect profile is recommended."
                exit 1
                fi

                CURRENT_PROFILE=$(authselect current -r | awk '{ print $1 }')
                # If not already in use, a custom profile is created preserving the enabled features.
                if [[ ! $CURRENT_PROFILE == custom/* ]]; then
                    ENABLED_FEATURES=$(authselect current | tail -n+3 | awk '{ print $2 }')
                    authselect create-profile hardening -b $CURRENT_PROFILE
                    CURRENT_PROFILE="custom/hardening"
                    
                    authselect apply-changes -b --backup=before-hardening-custom-profile
                    authselect select $CURRENT_PROFILE
                    for feature in $ENABLED_FEATURES; do
                        authselect enable-feature $feature;
                    done
                    
                    authselect apply-changes -b --backup=after-hardening-custom-profile
                fi
                PAM_FILE_NAME=$(basename "$pam_file")
                PAM_FILE_PATH="/etc/authselect/$CURRENT_PROFILE/$PAM_FILE_NAME"

                authselect apply-changes -b
            fi
            
        if grep -qP "^\s*auth\s.*\bpam_faillock.so\s.*\bunlock_time\b" "$PAM_FILE_PATH"; then
            sed -i -E --follow-symlinks "s/(.*auth.*pam_faillock.so.*)\bunlock_time\b=?[[:alnum:]]*(.*)/\1\2/g" "$PAM_FILE_PATH"
        fi
            if [ -f /usr/bin/authselect ]; then
                
                authselect apply-changes -b
            fi
        else
            echo "$pam_file was not found" >&2
        fi
    done
else
    for pam_file in "${AUTH_FILES[@]}"
    do
        if ! grep -qE '^\s*auth.*pam_faillock\.so (preauth|authfail).*unlock_time' "$pam_file"; then
            sed -i --follow-symlinks '/^auth.*required.*pam_faillock\.so.*preauth.*silent.*/ s/$/ unlock_time='"$var_accounts_passwords_pam_faillock_unlock_time"'/' "$pam_file"
            sed -i --follow-symlinks '/^auth.*required.*pam_faillock\.so.*authfail.*/ s/$/ unlock_time='"$var_accounts_passwords_pam_faillock_unlock_time"'/' "$pam_file"
        else
            sed -i --follow-symlinks 's/\(^auth.*required.*pam_faillock\.so.*preauth.*silent.*\)\('"unlock_time"'=\)[0-9]\+\(.*\)/\1\2'"$var_accounts_passwords_pam_faillock_unlock_time"'\3/' "$pam_file"
            sed -i --follow-symlinks 's/\(^auth.*required.*pam_faillock\.so.*authfail.*\)\('"unlock_time"'=\)[0-9]\+\(.*\)/\1\2'"$var_accounts_passwords_pam_faillock_unlock_time"'\3/' "$pam_file"
        fi
    done
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - CJIS-5.5.3
  - DISA-STIG-UBTU-20-010072
  - NIST-800-171-3.1.8
  - NIST-800-53-AC-7(b)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.1.7
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_faillock_unlock_time
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy

- name: Set Lockout Time for Failed Password Attempts - Check if system relies on
    authselect tool
  ansible.builtin.stat:
    path: /usr/bin/authselect
  register: result_authselect_present
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - CJIS-5.5.3
  - DISA-STIG-UBTU-20-010072
  - NIST-800-171-3.1.8
  - NIST-800-53-AC-7(b)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.1.7
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_faillock_unlock_time
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy

- name: Set Lockout Time for Failed Password Attempts - Remediation where authselect
    tool is present
  block:

  - name: Set Lockout Time for Failed Password Attempts - Check integrity of authselect
      current profile
    ansible.builtin.command:
      cmd: authselect check
    register: result_authselect_check_cmd
    changed_when: false
    failed_when: false

  - name: Set Lockout Time for Failed Password Attempts - Informative message based
      on the authselect integrity check result
    ansible.builtin.assert:
      that:
      - result_authselect_check_cmd.rc == 0
      fail_msg:
      - authselect integrity check failed. Remediation aborted!
      - This remediation could not be applied because an authselect profile was not
        selected or the selected profile is not intact.
      - It is not recommended to manually edit the PAM files when authselect tool
        is available.
      - In cases where the default authselect profile does not cover a specific demand,
        a custom authselect profile is recommended.
      success_msg:
      - authselect integrity check passed

  - name: Set Lockout Time for Failed Password Attempts - Get authselect current features
    ansible.builtin.shell:
      cmd: authselect current | tail -n+3 | awk '{ print $2 }'
    register: result_authselect_features
    changed_when: false
    when:
    - result_authselect_check_cmd is success

  - name: Set Lockout Time for Failed Password Attempts - Ensure "with-faillock" feature
      is enabled using authselect tool
    ansible.builtin.command:
      cmd: authselect enable-feature with-faillock
    register: result_authselect_enable_feature_cmd
    when:
    - result_authselect_check_cmd is success
    - result_authselect_features.stdout is not search("with-faillock")

  - name: Set Lockout Time for Failed Password Attempts - Ensure authselect changes
      are applied
    ansible.builtin.command:
      cmd: authselect apply-changes -b
    when:
    - result_authselect_enable_feature_cmd is not skipped
    - result_authselect_enable_feature_cmd is success
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_authselect_present.stat.exists
  tags:
  - CJIS-5.5.3
  - DISA-STIG-UBTU-20-010072
  - NIST-800-171-3.1.8
  - NIST-800-53-AC-7(b)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.1.7
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_faillock_unlock_time
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy

- name: Set Lockout Time for Failed Password Attempts - Remediation where authselect
    tool is not present
  block:

  - name: Set Lockout Time for Failed Password Attempts - Check if pam_faillock.so
      is already enabled
    ansible.builtin.lineinfile:
      path: /etc/pam.d/system-auth
      regexp: .*auth.*pam_faillock\.so (preauth|authfail)
      state: absent
    check_mode: true
    changed_when: false
    register: result_pam_faillock_is_enabled

  - name: Set Lockout Time for Failed Password Attempts - Enable pam_faillock.so preauth
      editing PAM files
    ansible.builtin.lineinfile:
      path: '{{ item }}'
      line: auth        required      pam_faillock.so preauth
      insertbefore: ^auth.*sufficient.*pam_unix\.so.*
      state: present
    loop:
    - /etc/pam.d/system-auth
    - /etc/pam.d/password-auth
    when:
    - result_pam_faillock_is_enabled.found == 0

  - name: Set Lockout Time for Failed Password Attempts - Enable pam_faillock.so authfail
      editing PAM files
    ansible.builtin.lineinfile:
      path: '{{ item }}'
      line: auth        required      pam_faillock.so authfail
      insertbefore: ^auth.*required.*pam_deny\.so.*
      state: present
    loop:
    - /etc/pam.d/system-auth
    - /etc/pam.d/password-auth
    when:
    - result_pam_faillock_is_enabled.found == 0

  - name: Set Lockout Time for Failed Password Attempts - Enable pam_faillock.so account
      section editing PAM files
    ansible.builtin.lineinfile:
      path: '{{ item }}'
      line: account     required      pam_faillock.so
      insertbefore: ^account.*required.*pam_unix\.so.*
      state: present
    loop:
    - /etc/pam.d/system-auth
    - /etc/pam.d/password-auth
    when:
    - result_pam_faillock_is_enabled.found == 0
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - not result_authselect_present.stat.exists
  tags:
  - CJIS-5.5.3
  - DISA-STIG-UBTU-20-010072
  - NIST-800-171-3.1.8
  - NIST-800-53-AC-7(b)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.1.7
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_faillock_unlock_time
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
- name: XCCDF Value var_accounts_passwords_pam_faillock_unlock_time # promote to variable
  set_fact:
    var_accounts_passwords_pam_faillock_unlock_time: !!str 0
  tags:
    - always

- name: Set Lockout Time for Failed Password Attempts - Check the presence of /etc/security/faillock.conf
    file
  ansible.builtin.stat:
    path: /etc/security/faillock.conf
  register: result_faillock_conf_check
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - CJIS-5.5.3
  - DISA-STIG-UBTU-20-010072
  - NIST-800-171-3.1.8
  - NIST-800-53-AC-7(b)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.1.7
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_faillock_unlock_time
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy

- name: Set Lockout Time for Failed Password Attempts - Ensure the pam_faillock.so
    unlock_time parameter in /etc/security/faillock.conf
  ansible.builtin.lineinfile:
    path: /etc/security/faillock.conf
    regexp: ^\s*unlock_time\s*=
    line: unlock_time = {{ var_accounts_passwords_pam_faillock_unlock_time }}
    state: present
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_faillock_conf_check.stat.exists
  tags:
  - CJIS-5.5.3
  - DISA-STIG-UBTU-20-010072
  - NIST-800-171-3.1.8
  - NIST-800-53-AC-7(b)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.1.7
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_faillock_unlock_time
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy

- name: Set Lockout Time for Failed Password Attempts - Ensure the pam_faillock.so
    unlock_time parameter not in PAM files
  block:

  - name: Set Lockout Time for Failed Password Attempts - Check if /etc/pam.d/system-auth
      file is present
    ansible.builtin.stat:
      path: /etc/pam.d/system-auth
    register: result_pam_file_present

  - name: Set Lockout Time for Failed Password Attempts - Check the proper remediation
      for the system
    block:

    - name: Set Lockout Time for Failed Password Attempts - Define the PAM file to
        be edited as a local fact
      ansible.builtin.set_fact:
        pam_file_path: /etc/pam.d/system-auth

    - name: Set Lockout Time for Failed Password Attempts - Check if system relies
        on authselect tool
      ansible.builtin.stat:
        path: /usr/bin/authselect
      register: result_authselect_present

    - name: Set Lockout Time for Failed Password Attempts - Ensure authselect custom
        profile is used if authselect is present
      block:

      - name: Set Lockout Time for Failed Password Attempts - Check integrity of authselect
          current profile
        ansible.builtin.command:
          cmd: authselect check
        register: result_authselect_check_cmd
        changed_when: false
        failed_when: false

      - name: Set Lockout Time for Failed Password Attempts - Informative message
          based on the authselect integrity check result
        ansible.builtin.assert:
          that:
          - result_authselect_check_cmd.rc == 0
          fail_msg:
          - authselect integrity check failed. Remediation aborted!
          - This remediation could not be applied because an authselect profile was
            not selected or the selected profile is not intact.
          - It is not recommended to manually edit the PAM files when authselect tool
            is available.
          - In cases where the default authselect profile does not cover a specific
            demand, a custom authselect profile is recommended.
          success_msg:
          - authselect integrity check passed

      - name: Set Lockout Time for Failed Password Attempts - Get authselect current
          profile
        ansible.builtin.shell:
          cmd: authselect current -r | awk '{ print $1 }'
        register: result_authselect_profile
        changed_when: false
        when:
        - result_authselect_check_cmd is success

      - name: Set Lockout Time for Failed Password Attempts - Define the current authselect
          profile as a local fact
        ansible.builtin.set_fact:
          authselect_current_profile: '{{ result_authselect_profile.stdout }}'
          authselect_custom_profile: '{{ result_authselect_profile.stdout }}'
        when:
        - result_authselect_profile is not skipped
        - result_authselect_profile.stdout is match("custom/")

      - name: Set Lockout Time for Failed Password Attempts - Define the new authselect
          custom profile as a local fact
        ansible.builtin.set_fact:
          authselect_current_profile: '{{ result_authselect_profile.stdout }}'
          authselect_custom_profile: custom/hardening
        when:
        - result_authselect_profile is not skipped
        - result_authselect_profile.stdout is not match("custom/")

      - name: Set Lockout Time for Failed Password Attempts - Get authselect current
          features to also enable them in the custom profile
        ansible.builtin.shell:
          cmd: authselect current | tail -n+3 | awk '{ print $2 }'
        register: result_authselect_features
        changed_when: false
        when:
        - result_authselect_profile is not skipped
        - authselect_current_profile is not match("custom/")

      - name: Set Lockout Time for Failed Password Attempts - Check if any custom
          profile with the same name was already created
        ansible.builtin.stat:
          path: /etc/authselect/{{ authselect_custom_profile }}
        register: result_authselect_custom_profile_present
        changed_when: false
        when:
        - authselect_current_profile is not match("custom/")

      - name: Set Lockout Time for Failed Password Attempts - Create an authselect
          custom profile based on the current profile
        ansible.builtin.command:
          cmd: authselect create-profile hardening -b {{ authselect_current_profile
            }}
        when:
        - result_authselect_check_cmd is success
        - authselect_current_profile is not match("custom/")
        - not result_authselect_custom_profile_present.stat.exists

      - name: Set Lockout Time for Failed Password Attempts - Ensure authselect changes
          are applied
        ansible.builtin.command:
          cmd: authselect apply-changes -b --backup=before-hardening-custom-profile
        when:
        - result_authselect_check_cmd is success
        - result_authselect_profile is not skipped
        - authselect_current_profile is not match("custom/")
        - authselect_custom_profile is not match(authselect_current_profile)

      - name: Set Lockout Time for Failed Password Attempts - Ensure the authselect
          custom profile is selected
        ansible.builtin.command:
          cmd: authselect select {{ authselect_custom_profile }}
        register: result_pam_authselect_select_profile
        when:
        - result_authselect_check_cmd is success
        - result_authselect_profile is not skipped
        - authselect_current_profile is not match("custom/")
        - authselect_custom_profile is not match(authselect_current_profile)

      - name: Set Lockout Time for Failed Password Attempts - Restore the authselect
          features in the custom profile
        ansible.builtin.command:
          cmd: authselect enable-feature {{ item }}
        loop: '{{ result_authselect_features.stdout_lines }}'
        register: result_pam_authselect_restore_features
        when:
        - result_authselect_profile is not skipped
        - result_authselect_features is not skipped
        - result_pam_authselect_select_profile is not skipped

      - name: Set Lockout Time for Failed Password Attempts - Ensure authselect changes
          are applied
        ansible.builtin.command:
          cmd: authselect apply-changes -b --backup=after-hardening-custom-profile
        when:
        - result_authselect_check_cmd is success
        - result_authselect_profile is not skipped
        - result_pam_authselect_restore_features is not skipped

      - name: Set Lockout Time for Failed Password Attempts - Change the PAM file
          to be edited according to the custom authselect profile
        ansible.builtin.set_fact:
          pam_file_path: /etc/authselect/{{ authselect_custom_profile }}/{{ pam_file_path
            | basename }}
      when:
      - result_authselect_present.stat.exists

    - name: Set Lockout Time for Failed Password Attempts - Define a fact for control
        already filtered in case filters are used
      ansible.builtin.set_fact:
        pam_module_control: ''

    - name: Set Lockout Time for Failed Password Attempts - Ensure the "unlock_time"
        option from "pam_faillock.so" is not present in {{ pam_file_path }}
      ansible.builtin.replace:
        dest: '{{ pam_file_path }}'
        regexp: (.*auth.*pam_faillock.so.*)\bunlock_time\b=?[0-9a-zA-Z]*(.*)
        replace: \1\2
      register: result_pam_option_removal

    - name: Set Lockout Time for Failed Password Attempts - Ensure authselect changes
        are applied
      ansible.builtin.command:
        cmd: authselect apply-changes -b
      when:
      - result_authselect_present.stat.exists
      - result_pam_option_removal is changed
    when:
    - result_pam_file_present.stat.exists

  - name: Set Lockout Time for Failed Password Attempts - Check if /etc/pam.d/password-auth
      file is present
    ansible.builtin.stat:
      path: /etc/pam.d/password-auth
    register: result_pam_file_present

  - name: Set Lockout Time for Failed Password Attempts - Check the proper remediation
      for the system
    block:

    - name: Set Lockout Time for Failed Password Attempts - Define the PAM file to
        be edited as a local fact
      ansible.builtin.set_fact:
        pam_file_path: /etc/pam.d/password-auth

    - name: Set Lockout Time for Failed Password Attempts - Check if system relies
        on authselect tool
      ansible.builtin.stat:
        path: /usr/bin/authselect
      register: result_authselect_present

    - name: Set Lockout Time for Failed Password Attempts - Ensure authselect custom
        profile is used if authselect is present
      block:

      - name: Set Lockout Time for Failed Password Attempts - Check integrity of authselect
          current profile
        ansible.builtin.command:
          cmd: authselect check
        register: result_authselect_check_cmd
        changed_when: false
        failed_when: false

      - name: Set Lockout Time for Failed Password Attempts - Informative message
          based on the authselect integrity check result
        ansible.builtin.assert:
          that:
          - result_authselect_check_cmd.rc == 0
          fail_msg:
          - authselect integrity check failed. Remediation aborted!
          - This remediation could not be applied because an authselect profile was
            not selected or the selected profile is not intact.
          - It is not recommended to manually edit the PAM files when authselect tool
            is available.
          - In cases where the default authselect profile does not cover a specific
            demand, a custom authselect profile is recommended.
          success_msg:
          - authselect integrity check passed

      - name: Set Lockout Time for Failed Password Attempts - Get authselect current
          profile
        ansible.builtin.shell:
          cmd: authselect current -r | awk '{ print $1 }'
        register: result_authselect_profile
        changed_when: false
        when:
        - result_authselect_check_cmd is success

      - name: Set Lockout Time for Failed Password Attempts - Define the current authselect
          profile as a local fact
        ansible.builtin.set_fact:
          authselect_current_profile: '{{ result_authselect_profile.stdout }}'
          authselect_custom_profile: '{{ result_authselect_profile.stdout }}'
        when:
        - result_authselect_profile is not skipped
        - result_authselect_profile.stdout is match("custom/")

      - name: Set Lockout Time for Failed Password Attempts - Define the new authselect
          custom profile as a local fact
        ansible.builtin.set_fact:
          authselect_current_profile: '{{ result_authselect_profile.stdout }}'
          authselect_custom_profile: custom/hardening
        when:
        - result_authselect_profile is not skipped
        - result_authselect_profile.stdout is not match("custom/")

      - name: Set Lockout Time for Failed Password Attempts - Get authselect current
          features to also enable them in the custom profile
        ansible.builtin.shell:
          cmd: authselect current | tail -n+3 | awk '{ print $2 }'
        register: result_authselect_features
        changed_when: false
        when:
        - result_authselect_profile is not skipped
        - authselect_current_profile is not match("custom/")

      - name: Set Lockout Time for Failed Password Attempts - Check if any custom
          profile with the same name was already created
        ansible.builtin.stat:
          path: /etc/authselect/{{ authselect_custom_profile }}
        register: result_authselect_custom_profile_present
        changed_when: false
        when:
        - authselect_current_profile is not match("custom/")

      - name: Set Lockout Time for Failed Password Attempts - Create an authselect
          custom profile based on the current profile
        ansible.builtin.command:
          cmd: authselect create-profile hardening -b {{ authselect_current_profile
            }}
        when:
        - result_authselect_check_cmd is success
        - authselect_current_profile is not match("custom/")
        - not result_authselect_custom_profile_present.stat.exists

      - name: Set Lockout Time for Failed Password Attempts - Ensure authselect changes
          are applied
        ansible.builtin.command:
          cmd: authselect apply-changes -b --backup=before-hardening-custom-profile
        when:
        - result_authselect_check_cmd is success
        - result_authselect_profile is not skipped
        - authselect_current_profile is not match("custom/")
        - authselect_custom_profile is not match(authselect_current_profile)

      - name: Set Lockout Time for Failed Password Attempts - Ensure the authselect
          custom profile is selected
        ansible.builtin.command:
          cmd: authselect select {{ authselect_custom_profile }}
        register: result_pam_authselect_select_profile
        when:
        - result_authselect_check_cmd is success
        - result_authselect_profile is not skipped
        - authselect_current_profile is not match("custom/")
        - authselect_custom_profile is not match(authselect_current_profile)

      - name: Set Lockout Time for Failed Password Attempts - Restore the authselect
          features in the custom profile
        ansible.builtin.command:
          cmd: authselect enable-feature {{ item }}
        loop: '{{ result_authselect_features.stdout_lines }}'
        register: result_pam_authselect_restore_features
        when:
        - result_authselect_profile is not skipped
        - result_authselect_features is not skipped
        - result_pam_authselect_select_profile is not skipped

      - name: Set Lockout Time for Failed Password Attempts - Ensure authselect changes
          are applied
        ansible.builtin.command:
          cmd: authselect apply-changes -b --backup=after-hardening-custom-profile
        when:
        - result_authselect_check_cmd is success
        - result_authselect_profile is not skipped
        - result_pam_authselect_restore_features is not skipped

      - name: Set Lockout Time for Failed Password Attempts - Change the PAM file
          to be edited according to the custom authselect profile
        ansible.builtin.set_fact:
          pam_file_path: /etc/authselect/{{ authselect_custom_profile }}/{{ pam_file_path
            | basename }}
      when:
      - result_authselect_present.stat.exists

    - name: Set Lockout Time for Failed Password Attempts - Define a fact for control
        already filtered in case filters are used
      ansible.builtin.set_fact:
        pam_module_control: ''

    - name: Set Lockout Time for Failed Password Attempts - Ensure the "unlock_time"
        option from "pam_faillock.so" is not present in {{ pam_file_path }}
      ansible.builtin.replace:
        dest: '{{ pam_file_path }}'
        regexp: (.*auth.*pam_faillock.so.*)\bunlock_time\b=?[0-9a-zA-Z]*(.*)
        replace: \1\2
      register: result_pam_option_removal

    - name: Set Lockout Time for Failed Password Attempts - Ensure authselect changes
        are applied
      ansible.builtin.command:
        cmd: authselect apply-changes -b
      when:
      - result_authselect_present.stat.exists
      - result_pam_option_removal is changed
    when:
    - result_pam_file_present.stat.exists
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - result_faillock_conf_check.stat.exists
  tags:
  - CJIS-5.5.3
  - DISA-STIG-UBTU-20-010072
  - NIST-800-171-3.1.8
  - NIST-800-53-AC-7(b)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.1.7
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_faillock_unlock_time
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy

- name: Set Lockout Time for Failed Password Attempts - Ensure the pam_faillock.so
    unlock_time parameter in PAM files
  block:

  - name: Set Lockout Time for Failed Password Attempts - Check if pam_faillock.so
      unlock_time parameter is already enabled in pam files
    ansible.builtin.lineinfile:
      path: /etc/pam.d/system-auth
      regexp: .*auth.*pam_faillock\.so (preauth|authfail).*unlock_time
      state: absent
    check_mode: true
    changed_when: false
    register: result_pam_faillock_unlock_time_parameter_is_present

  - name: Set Lockout Time for Failed Password Attempts - Ensure the inclusion of
      pam_faillock.so preauth unlock_time parameter in auth section
    ansible.builtin.lineinfile:
      path: '{{ item }}'
      backrefs: true
      regexp: (^\s*auth\s+)([\w\[].*\b)(\s+pam_faillock.so preauth.*)
      line: \1required\3 unlock_time={{ var_accounts_passwords_pam_faillock_unlock_time
        }}
      state: present
    loop:
    - /etc/pam.d/system-auth
    - /etc/pam.d/password-auth
    when:
    - result_pam_faillock_unlock_time_parameter_is_present.found == 0

  - name: Set Lockout Time for Failed Password Attempts - Ensure the inclusion of
      pam_faillock.so authfail unlock_time parameter in auth section
    ansible.builtin.lineinfile:
      path: '{{ item }}'
      backrefs: true
      regexp: (^\s*auth\s+)([\w\[].*\b)(\s+pam_faillock.so authfail.*)
      line: \1required\3 unlock_time={{ var_accounts_passwords_pam_faillock_unlock_time
        }}
      state: present
    loop:
    - /etc/pam.d/system-auth
    - /etc/pam.d/password-auth
    when:
    - result_pam_faillock_unlock_time_parameter_is_present.found == 0

  - name: Set Lockout Time for Failed Password Attempts - Ensure the desired value
      for pam_faillock.so preauth unlock_time parameter in auth section
    ansible.builtin.lineinfile:
      path: '{{ item }}'
      backrefs: true
      regexp: (^\s*auth\s+)([\w\[].*\b)(\s+pam_faillock.so preauth.*)(unlock_time)=[0-9]+(.*)
      line: \1required\3\4={{ var_accounts_passwords_pam_faillock_unlock_time }}\5
      state: present
    loop:
    - /etc/pam.d/system-auth
    - /etc/pam.d/password-auth
    when:
    - result_pam_faillock_unlock_time_parameter_is_present.found > 0

  - name: Set Lockout Time for Failed Password Attempts - Ensure the desired value
      for pam_faillock.so authfail unlock_time parameter in auth section
    ansible.builtin.lineinfile:
      path: '{{ item }}'
      backrefs: true
      regexp: (^\s*auth\s+)([\w\[].*\b)(\s+pam_faillock.so authfail.*)(unlock_time)=[0-9]+(.*)
      line: \1required\3\4={{ var_accounts_passwords_pam_faillock_unlock_time }}\5
      state: present
    loop:
    - /etc/pam.d/system-auth
    - /etc/pam.d/password-auth
    when:
    - result_pam_faillock_unlock_time_parameter_is_present.found > 0
  when:
  - '"libpam-runtime" in ansible_facts.packages'
  - not result_faillock_conf_check.stat.exists
  tags:
  - CJIS-5.5.3
  - DISA-STIG-UBTU-20-010072
  - NIST-800-171-3.1.8
  - NIST-800-53-AC-7(b)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.1.7
  - PCI-DSSv4-8.3
  - PCI-DSSv4-8.3.4
  - accounts_passwords_pam_faillock_unlock_time
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy

Warning

If the system supports the new /etc/security/faillock.conf file but the pam_faillock.so parameters are defined directly in /etc/pam.d/system-auth and /etc/pam.d/password-auth, the remediation will migrate the unlock_time parameter to /etc/security/faillock.conf to ensure compatibility with authselect tool. The parameters deny and fail_interval, if used, also have to be migrated by their respective remediation.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers