Record Events that Modify the System's Mandatory Access Controls

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

If the auditd daemon is configured to use the augenrules program to read audit rules during daemon startup (the default), add the following line to a file with suffix .rules in the directory /etc/audit/rules.d:

-w /etc/selinux/ -p wa -k MAC-policy

If the auditd daemon is configured to use the auditctl utility to read audit rules during daemon startup, add the following line to /etc/audit/audit.rules file:

-w /etc/selinux/ -p wa -k MAC-policy

Rationale

The system’s mandatory access policy (SELinux) should not be arbitrarily changed by anything other than administrator action. All changes to MAC policy should be audited.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Perform the remediation for both possible tools: 'auditctl' and 'augenrules'
<ns10:sub idref="xccdf_org.ssgproject.content_value_function_fix_audit_watch_rule" use="legacy"/>
fix_audit_watch_rule "auditctl" "/etc/selinux/" "wa" "MAC-policy"
fix_audit_watch_rule "augenrules" "/etc/selinux/" "wa" "MAC-policy"
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers