Install PAE Kernel on Supported 32-bit x86 Systems

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

Systems that are using the 64-bit x86 kernel package do not need to install the kernel-PAE package because the 64-bit x86 kernel already includes this support. However, if the system is 32-bit and also supports the PAE and NX features as determined in the previous section, the kernel-PAE package should be installed to enable XD or NX support. The kernel-PAE package can be installed with the following command:


$ sudo yum install kernel-PAE

The installation process should also have configured the bootloader to load the new kernel at boot. Verify this after reboot and modify /etc/default/grub if necessary.

Rationale

On 32-bit systems that support the XD or NX bit, the vendor-supplied PAE kernel is required to enable either Execute Disable (XD) or No Execute (NX) support.

Warning

The kernel-PAE package should not be installed on older systems that do not support the XD or NX bit, as 8this may prevent them from booting.8

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers