Ensure iptables Firewall Rules Exist for All Open Ports

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

Any ports that have been opened on non-loopback addresses need firewall rules to govern traffic.

Rationale

Without a firewall rule configured for open ports default firewall policy will drop all packets to these ports.

Warning

Changing firewall settings while connected over network can result in being locked out of the system.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers