Install pam_pwquality Package

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

The libpam-pwquality package can be installed with the following command:


$ apt-get install libpam-pwquality

Rationale

Use of a complex password helps to increase the time and resources required to compromise the password. Password complexity, or strength, is a measure of the effectiveness of a password in resisting attempts at guessing and brute-force attacks. “pwquality” enforces complex password construction configuration and has the ability to limit brute-force attacks on the system.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}\n' 'libpam-runtime' 2>/dev/null | grep -q installed; then

DEBIAN_FRONTEND=noninteractive apt-get install -y "libpam-pwquality"

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - DISA-STIG-UBTU-20-010057
  - enable_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - package_pam_pwquality_installed

- name: Ensure libpam-pwquality is installed
  package:
    name: libpam-pwquality
    state: present
  when: '"libpam-runtime" in ansible_facts.packages'
  tags:
  - DISA-STIG-UBTU-20-010057
  - enable_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - package_pam_pwquality_installed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers