Remove the X Windows Package Group

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

By removing the xorg-x11-server-common package, the system no longer has X Windows installed. If X Windows is not installed then the system cannot boot into graphical user mode. This prevents the system from being accidentally or maliciously booted into a graphical.target mode. To do so, run the following command:

$ sudo apt_get groupremove "X Window System"
$ sudo apt_get remove xorg-x11-server-common

Rationale

Unnecessary service packages must not be installed to decrease the attack surface of the system. X windows has a long history of security vulnerabilities and should not be installed unless approved and documented.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# CAUTION: This remediation script will remove xserver-xorg
#	   from the system, and may remove any packages
#	   that depend on xserver-xorg. Execute this
#	   remediation AFTER testing on a non-production
#	   system!

DEBIAN_FRONTEND=noninteractive apt-get remove -y "xserver-xorg"

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Ensure xserver-xorg is removed
  package:
    name: xserver-xorg
    state: absent
  tags:
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - disable_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - package_xorg-x11-server-common_removed

Warning

The installation and use of a Graphical User Interface (GUI) increases your attack vector and decreases your overall security posture. Removing the package xorg-x11-server-common package will remove the graphical target which might bring your system to an inconsistent state requiring additional configuration to access the system again. If a GUI is an operational requirement, a tailored profile that removes this rule should used before continuing installation.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers