Ensure network interfaces are assigned to appropriate zone

This page is not yet available in Spanish. We are working on its translation.
If you have any questions or feedback about our current translation project, feel free to reach out to us!

Description

Firewall zones define the trust level of network connections or interfaces. Note: Changing firewall settings while connected over network can result in being locked out of the system.

Rationale

A network interface not assigned to the appropriate zone can allow unexpected or undesired network traffic to be accepted on the interface.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers