Intégration Webhooks

Configurez votre intégration Datadog/Webhooks directement via l’API Datadog. Consultez la page de lʼintégration Webhooks pour en savoir plus.

POST https://api.ap1.datadoghq.com/api/v1/integration/webhooks/configuration/webhookshttps://api.datadoghq.eu/api/v1/integration/webhooks/configuration/webhookshttps://api.ddog-gov.com/api/v1/integration/webhooks/configuration/webhookshttps://api.datadoghq.com/api/v1/integration/webhooks/configuration/webhookshttps://api.us3.datadoghq.com/api/v1/integration/webhooks/configuration/webhookshttps://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks

Présentation

Crée un endpoint <NOM_WEBHOOK>. This endpoint requires the create_webhooks permission.

OAuth apps require the create_webhooks authorization scope to access this endpoint.

Requête

Body Data (required)

Corps de requête pour la création d’une intégration Webhooks.

Expand All

Champ

Type

Description

custom_headers

string

If null, uses no header. If given a JSON payload, these will be headers attached to your webhook.

encode_as

enum

Encoding type. Can be given either json or form. Allowed enum values: json,form

default: json

name [required]

string

The name of the webhook. It corresponds with <WEBHOOK_NAME>. Learn more on how to use it in monitor notifications.

payload

string

If null, uses the default payload. If given a JSON payload, the webhook returns the payload specified by the given payload. Webhooks variable usage.

url [required]

string

URL of the webhook.

{
  "name": "Example-Webhooks-Integration",
  "url": "https://example.com/webhook"
}

Réponse

OK

Datadog-Webhooks integration.

Expand All

Champ

Type

Description

custom_headers

string

If null, uses no header. If given a JSON payload, these will be headers attached to your webhook.

encode_as

enum

Encoding type. Can be given either json or form. Allowed enum values: json,form

default: json

name [required]

string

The name of the webhook. It corresponds with <WEBHOOK_NAME>. Learn more on how to use it in monitor notifications.

payload

string

If null, uses the default payload. If given a JSON payload, the webhook returns the payload specified by the given payload. Webhooks variable usage.

url [required]

string

URL of the webhook.

{
  "custom_headers": "string",
  "encode_as": "string",
  "name": "WEBHOOK_NAME",
  "payload": "string",
  "url": "https://example.com/webhook"
}

Bad Request

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication error

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "name": "Example-Webhooks-Integration", "url": "https://example.com/webhook" } EOF
// Create a webhooks integration returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	body := datadogV1.WebhooksIntegration{
		Name: "Example-Webhooks-Integration",
		Url:  "https://example.com/webhook",
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewWebhooksIntegrationApi(apiClient)
	resp, r, err := api.CreateWebhooksIntegration(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `WebhooksIntegrationApi.CreateWebhooksIntegration`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `WebhooksIntegrationApi.CreateWebhooksIntegration`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" go run "main.go"
// Create a webhooks integration returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.WebhooksIntegrationApi;
import com.datadog.api.client.v1.model.WebhooksIntegration;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    WebhooksIntegrationApi apiInstance = new WebhooksIntegrationApi(defaultClient);

    WebhooksIntegration body =
        new WebhooksIntegration()
            .name("Example-Webhooks-Integration")
            .url("https://example.com/webhook");

    try {
      WebhooksIntegration result = apiInstance.createWebhooksIntegration(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling WebhooksIntegrationApi#createWebhooksIntegration");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" java "Example.java"
"""
Create a webhooks integration returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.webhooks_integration_api import WebhooksIntegrationApi
from datadog_api_client.v1.model.webhooks_integration import WebhooksIntegration

body = WebhooksIntegration(
    name="Example-Webhooks-Integration",
    url="https://example.com/webhook",
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = WebhooksIntegrationApi(api_client)
    response = api_instance.create_webhooks_integration(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" python3 "example.py"
# Create a webhooks integration returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::WebhooksIntegrationAPI.new

body = DatadogAPIClient::V1::WebhooksIntegration.new({
  name: "Example-Webhooks-Integration",
  url: "https://example.com/webhook",
})
p api_instance.create_webhooks_integration(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" rb "example.rb"
// Create a webhooks integration returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_webhooks_integration::WebhooksIntegrationAPI;
use datadog_api_client::datadogV1::model::WebhooksIntegration;

#[tokio::main]
async fn main() {
    let body = WebhooksIntegration::new(
        "Example-Webhooks-Integration".to_string(),
        "https://example.com/webhook".to_string(),
    );
    let configuration = datadog::Configuration::new();
    let api = WebhooksIntegrationAPI::with_config(configuration);
    let resp = api.create_webhooks_integration(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" cargo run
/**
 * Create a webhooks integration returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.WebhooksIntegrationApi(configuration);

const params: v1.WebhooksIntegrationApiCreateWebhooksIntegrationRequest = {
  body: {
    name: "Example-Webhooks-Integration",
    url: "https://example.com/webhook",
  },
};

apiInstance
  .createWebhooksIntegration(params)
  .then((data: v1.WebhooksIntegration) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<DD_API_KEY>" DD_APP_KEY="<DD_APP_KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.datadoghq.eu/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.ddog-gov.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.us3.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}

Présentation

Récupère le contenu du Webhook <NOM_WEBHOOK>. This endpoint requires the integrations_read permission.

Arguments

Paramètres du chemin

Nom

Type

Description

webhook_name [required]

string

The name of the webhook.

Réponse

OK

Datadog-Webhooks integration.

Expand All

Champ

Type

Description

custom_headers

string

If null, uses no header. If given a JSON payload, these will be headers attached to your webhook.

encode_as

enum

Encoding type. Can be given either json or form. Allowed enum values: json,form

default: json

name [required]

string

The name of the webhook. It corresponds with <WEBHOOK_NAME>. Learn more on how to use it in monitor notifications.

payload

string

If null, uses the default payload. If given a JSON payload, the webhook returns the payload specified by the given payload. Webhooks variable usage.

url [required]

string

URL of the webhook.

{
  "custom_headers": "string",
  "encode_as": "string",
  "name": "WEBHOOK_NAME",
  "payload": "string",
  "url": "https://example.com/webhook"
}

Bad Request

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication error

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Item Not Found

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                  # Path parameters
export webhook_name="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/${webhook_name}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get a webhook integration returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.webhooks_integration_api import WebhooksIntegrationApi

# there is a valid "webhook" in the system
WEBHOOK_NAME = environ["WEBHOOK_NAME"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = WebhooksIntegrationApi(api_client)
    response = api_instance.get_webhooks_integration(
        webhook_name=WEBHOOK_NAME,
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Get a webhook integration returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::WebhooksIntegrationAPI.new

# there is a valid "webhook" in the system
WEBHOOK_NAME = ENV["WEBHOOK_NAME"]
p api_instance.get_webhooks_integration(WEBHOOK_NAME)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Get a webhook integration returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "webhook" in the system
	WebhookName := os.Getenv("WEBHOOK_NAME")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewWebhooksIntegrationApi(apiClient)
	resp, r, err := api.GetWebhooksIntegration(ctx, WebhookName)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `WebhooksIntegrationApi.GetWebhooksIntegration`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `WebhooksIntegrationApi.GetWebhooksIntegration`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Get a webhook integration returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.WebhooksIntegrationApi;
import com.datadog.api.client.v1.model.WebhooksIntegration;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    WebhooksIntegrationApi apiInstance = new WebhooksIntegrationApi(defaultClient);

    // there is a valid "webhook" in the system
    String WEBHOOK_NAME = System.getenv("WEBHOOK_NAME");

    try {
      WebhooksIntegration result = apiInstance.getWebhooksIntegration(WEBHOOK_NAME);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling WebhooksIntegrationApi#getWebhooksIntegration");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Get a webhook integration returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_webhooks_integration::WebhooksIntegrationAPI;

#[tokio::main]
async fn main() {
    // there is a valid "webhook" in the system
    let webhook_name = std::env::var("WEBHOOK_NAME").unwrap();
    let configuration = datadog::Configuration::new();
    let api = WebhooksIntegrationAPI::with_config(configuration);
    let resp = api.get_webhooks_integration(webhook_name.clone()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Get a webhook integration returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.WebhooksIntegrationApi(configuration);

// there is a valid "webhook" in the system
const WEBHOOK_NAME = process.env.WEBHOOK_NAME as string;

const params: v1.WebhooksIntegrationApiGetWebhooksIntegrationRequest = {
  webhookName: WEBHOOK_NAME,
};

apiInstance
  .getWebhooksIntegration(params)
  .then((data: v1.WebhooksIntegration) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PUT https://api.ap1.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.datadoghq.eu/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.ddog-gov.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.us3.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}

Présentation

Met à jour l’endpoint <NOM_WEBHOOK>. This endpoint requires the manage_integrations permission.

Arguments

Paramètres du chemin

Nom

Type

Description

webhook_name [required]

string

The name of the webhook.

Requête

Body Data (required)

Mettez à jour une intégration Datadog/Webhooks existante.

Expand All

Champ

Type

Description

custom_headers

string

If null, uses no header. If given a JSON payload, these will be headers attached to your webhook.

encode_as

enum

Encoding type. Can be given either json or form. Allowed enum values: json,form

default: json

name

string

The name of the webhook. It corresponds with <WEBHOOK_NAME>. Learn more on how to use it in monitor notifications.

payload

string

If null, uses the default payload. If given a JSON payload, the webhook returns the payload specified by the given payload. Webhooks variable usage.

url

string

URL of the webhook.

{
  "url": "https://example.com/webhook-updated"
}

Réponse

OK

Datadog-Webhooks integration.

Expand All

Champ

Type

Description

custom_headers

string

If null, uses no header. If given a JSON payload, these will be headers attached to your webhook.

encode_as

enum

Encoding type. Can be given either json or form. Allowed enum values: json,form

default: json

name [required]

string

The name of the webhook. It corresponds with <WEBHOOK_NAME>. Learn more on how to use it in monitor notifications.

payload

string

If null, uses the default payload. If given a JSON payload, the webhook returns the payload specified by the given payload. Webhooks variable usage.

url [required]

string

URL of the webhook.

{
  "custom_headers": "string",
  "encode_as": "string",
  "name": "WEBHOOK_NAME",
  "payload": "string",
  "url": "https://example.com/webhook"
}

Bad Request

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication error

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Item Not Found

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                          # Path parameters
export webhook_name="CHANGE_ME"
# Curl command
curl -X PUT "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/${webhook_name}" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "url": "https://example.com/webhook-updated" } EOF
// Update a webhook returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "webhook" in the system
	WebhookName := os.Getenv("WEBHOOK_NAME")

	body := datadogV1.WebhooksIntegrationUpdateRequest{
		Url: datadog.PtrString("https://example.com/webhook-updated"),
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewWebhooksIntegrationApi(apiClient)
	resp, r, err := api.UpdateWebhooksIntegration(ctx, WebhookName, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `WebhooksIntegrationApi.UpdateWebhooksIntegration`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `WebhooksIntegrationApi.UpdateWebhooksIntegration`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Update a webhook returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.WebhooksIntegrationApi;
import com.datadog.api.client.v1.model.WebhooksIntegration;
import com.datadog.api.client.v1.model.WebhooksIntegrationUpdateRequest;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    WebhooksIntegrationApi apiInstance = new WebhooksIntegrationApi(defaultClient);

    // there is a valid "webhook" in the system
    String WEBHOOK_NAME = System.getenv("WEBHOOK_NAME");

    WebhooksIntegrationUpdateRequest body =
        new WebhooksIntegrationUpdateRequest().url("https://example.com/webhook-updated");

    try {
      WebhooksIntegration result = apiInstance.updateWebhooksIntegration(WEBHOOK_NAME, body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println("Exception when calling WebhooksIntegrationApi#updateWebhooksIntegration");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Update a webhook returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.webhooks_integration_api import WebhooksIntegrationApi
from datadog_api_client.v1.model.webhooks_integration_update_request import WebhooksIntegrationUpdateRequest

# there is a valid "webhook" in the system
WEBHOOK_NAME = environ["WEBHOOK_NAME"]

body = WebhooksIntegrationUpdateRequest(
    url="https://example.com/webhook-updated",
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = WebhooksIntegrationApi(api_client)
    response = api_instance.update_webhooks_integration(webhook_name=WEBHOOK_NAME, body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Update a webhook returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::WebhooksIntegrationAPI.new

# there is a valid "webhook" in the system
WEBHOOK_NAME = ENV["WEBHOOK_NAME"]

body = DatadogAPIClient::V1::WebhooksIntegrationUpdateRequest.new({
  url: "https://example.com/webhook-updated",
})
p api_instance.update_webhooks_integration(WEBHOOK_NAME, body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Update a webhook returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_webhooks_integration::WebhooksIntegrationAPI;
use datadog_api_client::datadogV1::model::WebhooksIntegrationUpdateRequest;

#[tokio::main]
async fn main() {
    // there is a valid "webhook" in the system
    let webhook_name = std::env::var("WEBHOOK_NAME").unwrap();
    let body = WebhooksIntegrationUpdateRequest::new()
        .url("https://example.com/webhook-updated".to_string());
    let configuration = datadog::Configuration::new();
    let api = WebhooksIntegrationAPI::with_config(configuration);
    let resp = api
        .update_webhooks_integration(webhook_name.clone(), body)
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Update a webhook returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.WebhooksIntegrationApi(configuration);

// there is a valid "webhook" in the system
const WEBHOOK_NAME = process.env.WEBHOOK_NAME as string;

const params: v1.WebhooksIntegrationApiUpdateWebhooksIntegrationRequest = {
  body: {
    url: "https://example.com/webhook-updated",
  },
  webhookName: WEBHOOK_NAME,
};

apiInstance
  .updateWebhooksIntegration(params)
  .then((data: v1.WebhooksIntegration) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

DELETE https://api.ap1.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.datadoghq.eu/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.ddog-gov.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.us3.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/{webhook_name}

Présentation

Supprime l’endpoint <NOM_WEBHOOK>. This endpoint requires the manage_integrations permission.

Arguments

Paramètres du chemin

Nom

Type

Description

webhook_name [required]

string

The name of the webhook.

Réponse

OK

Authentication error

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Item Not Found

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                  # Path parameters
export webhook_name="CHANGE_ME"
# Curl command
curl -X DELETE "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/webhooks/${webhook_name}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Delete a webhook returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.webhooks_integration_api import WebhooksIntegrationApi

# there is a valid "webhook" in the system
WEBHOOK_NAME = environ["WEBHOOK_NAME"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = WebhooksIntegrationApi(api_client)
    api_instance.delete_webhooks_integration(
        webhook_name=WEBHOOK_NAME,
    )

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Delete a webhook returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::WebhooksIntegrationAPI.new

# there is a valid "webhook" in the system
WEBHOOK_NAME = ENV["WEBHOOK_NAME"]
p api_instance.delete_webhooks_integration(WEBHOOK_NAME)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Delete a webhook returns "OK" response

package main

import (
	"context"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "webhook" in the system
	WebhookName := os.Getenv("WEBHOOK_NAME")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewWebhooksIntegrationApi(apiClient)
	r, err := api.DeleteWebhooksIntegration(ctx, WebhookName)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `WebhooksIntegrationApi.DeleteWebhooksIntegration`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Delete a webhook returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.WebhooksIntegrationApi;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    WebhooksIntegrationApi apiInstance = new WebhooksIntegrationApi(defaultClient);

    // there is a valid "webhook" in the system
    String WEBHOOK_NAME = System.getenv("WEBHOOK_NAME");

    try {
      apiInstance.deleteWebhooksIntegration(WEBHOOK_NAME);
    } catch (ApiException e) {
      System.err.println("Exception when calling WebhooksIntegrationApi#deleteWebhooksIntegration");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Delete a webhook returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_webhooks_integration::WebhooksIntegrationAPI;

#[tokio::main]
async fn main() {
    // there is a valid "webhook" in the system
    let webhook_name = std::env::var("WEBHOOK_NAME").unwrap();
    let configuration = datadog::Configuration::new();
    let api = WebhooksIntegrationAPI::with_config(configuration);
    let resp = api.delete_webhooks_integration(webhook_name.clone()).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Delete a webhook returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.WebhooksIntegrationApi(configuration);

// there is a valid "webhook" in the system
const WEBHOOK_NAME = process.env.WEBHOOK_NAME as string;

const params: v1.WebhooksIntegrationApiDeleteWebhooksIntegrationRequest = {
  webhookName: WEBHOOK_NAME,
};

apiInstance
  .deleteWebhooksIntegration(params)
  .then((data: any) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

POST https://api.ap1.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variableshttps://api.datadoghq.eu/api/v1/integration/webhooks/configuration/custom-variableshttps://api.ddog-gov.com/api/v1/integration/webhooks/configuration/custom-variableshttps://api.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variableshttps://api.us3.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variableshttps://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables

Présentation

Crée un endpoint avec le nom <NOM_VARIABLE_PERSONNALISÉE>. This endpoint requires the manage_integrations permission.

Requête

Body Data (required)

Corps de requête pour la définition d’une variable personnalisée.

Expand All

Champ

Type

Description

is_secret [required]

boolean

Make custom variable is secret or not. If the custom variable is secret, the value is not returned in the response payload.

name [required]

string

The name of the variable. It corresponds with <CUSTOM_VARIABLE_NAME>.

value [required]

string

Value of the custom variable.

{
  "is_secret": true,
  "name": "EXAMPLEWEBHOOKSINTEGRATION",
  "value": "CUSTOM_VARIABLE_VALUE"
}

Réponse

OK

Custom variable for Webhook integration.

Expand All

Champ

Type

Description

is_secret [required]

boolean

Make custom variable is secret or not. If the custom variable is secret, the value is not returned in the response payload.

name [required]

string

The name of the variable. It corresponds with <CUSTOM_VARIABLE_NAME>. It must only contains upper-case characters, integers or underscores.

value

string

Value of the custom variable. It won't be returned if the variable is secret.

{
  "is_secret": true,
  "name": "CUSTOM_VARIABLE_NAME",
  "value": "CUSTOM_VARIABLE_VALUE"
}

Bad Request

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication error

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                          # Curl command
curl -X POST "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "is_secret": true, "name": "EXAMPLEWEBHOOKSINTEGRATION", "value": "CUSTOM_VARIABLE_VALUE" } EOF
// Create a custom variable returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	body := datadogV1.WebhooksIntegrationCustomVariable{
		IsSecret: true,
		Name:     "EXAMPLEWEBHOOKSINTEGRATION",
		Value:    "CUSTOM_VARIABLE_VALUE",
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewWebhooksIntegrationApi(apiClient)
	resp, r, err := api.CreateWebhooksIntegrationCustomVariable(ctx, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `WebhooksIntegrationApi.CreateWebhooksIntegrationCustomVariable`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `WebhooksIntegrationApi.CreateWebhooksIntegrationCustomVariable`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Create a custom variable returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.WebhooksIntegrationApi;
import com.datadog.api.client.v1.model.WebhooksIntegrationCustomVariable;
import com.datadog.api.client.v1.model.WebhooksIntegrationCustomVariableResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    WebhooksIntegrationApi apiInstance = new WebhooksIntegrationApi(defaultClient);

    WebhooksIntegrationCustomVariable body =
        new WebhooksIntegrationCustomVariable()
            .isSecret(true)
            .name("EXAMPLEWEBHOOKSINTEGRATION")
            .value("CUSTOM_VARIABLE_VALUE");

    try {
      WebhooksIntegrationCustomVariableResponse result =
          apiInstance.createWebhooksIntegrationCustomVariable(body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println(
          "Exception when calling WebhooksIntegrationApi#createWebhooksIntegrationCustomVariable");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Create a custom variable returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.webhooks_integration_api import WebhooksIntegrationApi
from datadog_api_client.v1.model.webhooks_integration_custom_variable import WebhooksIntegrationCustomVariable

body = WebhooksIntegrationCustomVariable(
    is_secret=True,
    name="EXAMPLEWEBHOOKSINTEGRATION",
    value="CUSTOM_VARIABLE_VALUE",
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = WebhooksIntegrationApi(api_client)
    response = api_instance.create_webhooks_integration_custom_variable(body=body)

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Create a custom variable returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::WebhooksIntegrationAPI.new

body = DatadogAPIClient::V1::WebhooksIntegrationCustomVariable.new({
  is_secret: true,
  name: "EXAMPLEWEBHOOKSINTEGRATION",
  value: "CUSTOM_VARIABLE_VALUE",
})
p api_instance.create_webhooks_integration_custom_variable(body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Create a custom variable returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_webhooks_integration::WebhooksIntegrationAPI;
use datadog_api_client::datadogV1::model::WebhooksIntegrationCustomVariable;

#[tokio::main]
async fn main() {
    let body = WebhooksIntegrationCustomVariable::new(
        true,
        "EXAMPLEWEBHOOKSINTEGRATION".to_string(),
        "CUSTOM_VARIABLE_VALUE".to_string(),
    );
    let configuration = datadog::Configuration::new();
    let api = WebhooksIntegrationAPI::with_config(configuration);
    let resp = api.create_webhooks_integration_custom_variable(body).await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Create a custom variable returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.WebhooksIntegrationApi(configuration);

const params: v1.WebhooksIntegrationApiCreateWebhooksIntegrationCustomVariableRequest =
  {
    body: {
      isSecret: true,
      name: "EXAMPLEWEBHOOKSINTEGRATION",
      value: "CUSTOM_VARIABLE_VALUE",
    },
  };

apiInstance
  .createWebhooksIntegrationCustomVariable(params)
  .then((data: v1.WebhooksIntegrationCustomVariableResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

GET https://api.ap1.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.datadoghq.eu/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.ddog-gov.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.us3.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}

Présentation

Affiche le contenu de la variable personnalisée <NOM_VARIABLE_PERSONNALISÉE>. Si la variable personnalisée est secrète, renvoie null pour <NOM_VARIABLE_PERSONNALISÉE> dans la charge utile de la réponse. This endpoint requires the integrations_read permission.

Arguments

Paramètres du chemin

Nom

Type

Description

custom_variable_name [required]

string

The name of the custom variable.

Réponse

OK

Custom variable for Webhook integration.

Expand All

Champ

Type

Description

is_secret [required]

boolean

Make custom variable is secret or not. If the custom variable is secret, the value is not returned in the response payload.

name [required]

string

The name of the variable. It corresponds with <CUSTOM_VARIABLE_NAME>. It must only contains upper-case characters, integers or underscores.

value

string

Value of the custom variable. It won't be returned if the variable is secret.

{
  "is_secret": true,
  "name": "CUSTOM_VARIABLE_NAME",
  "value": "CUSTOM_VARIABLE_VALUE"
}

Bad Request

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication error

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Item Not Found

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                  # Path parameters
export custom_variable_name="CHANGE_ME"
# Curl command
curl -X GET "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/${custom_variable_name}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Get a custom variable returns "OK" response
"""

from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.webhooks_integration_api import WebhooksIntegrationApi

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = WebhooksIntegrationApi(api_client)
    response = api_instance.get_webhooks_integration_custom_variable(
        custom_variable_name="custom_variable_name",
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Get a custom variable returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::WebhooksIntegrationAPI.new
p api_instance.get_webhooks_integration_custom_variable("custom_variable_name")

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Get a custom variable returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewWebhooksIntegrationApi(apiClient)
	resp, r, err := api.GetWebhooksIntegrationCustomVariable(ctx, "custom_variable_name")

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `WebhooksIntegrationApi.GetWebhooksIntegrationCustomVariable`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `WebhooksIntegrationApi.GetWebhooksIntegrationCustomVariable`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Get a custom variable returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.WebhooksIntegrationApi;
import com.datadog.api.client.v1.model.WebhooksIntegrationCustomVariableResponse;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    WebhooksIntegrationApi apiInstance = new WebhooksIntegrationApi(defaultClient);

    try {
      WebhooksIntegrationCustomVariableResponse result =
          apiInstance.getWebhooksIntegrationCustomVariable("custom_variable_name");
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println(
          "Exception when calling WebhooksIntegrationApi#getWebhooksIntegrationCustomVariable");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Get a custom variable returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_webhooks_integration::WebhooksIntegrationAPI;

#[tokio::main]
async fn main() {
    let configuration = datadog::Configuration::new();
    let api = WebhooksIntegrationAPI::with_config(configuration);
    let resp = api
        .get_webhooks_integration_custom_variable("custom_variable_name".to_string())
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Get a custom variable returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.WebhooksIntegrationApi(configuration);

const params: v1.WebhooksIntegrationApiGetWebhooksIntegrationCustomVariableRequest =
  {
    customVariableName: "custom_variable_name",
  };

apiInstance
  .getWebhooksIntegrationCustomVariable(params)
  .then((data: v1.WebhooksIntegrationCustomVariableResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PUT https://api.ap1.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.datadoghq.eu/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.ddog-gov.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.us3.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}

Présentation

Met à jour l’endpoint <CUSTOM_VARIABLE_NAME>. This endpoint requires the manage_integrations permission.

Arguments

Paramètres du chemin

Nom

Type

Description

custom_variable_name [required]

string

The name of the custom variable.

Requête

Body Data (required)

Corps de requête pour la mise à jour d’une variable personnalisée existante.

Expand All

Champ

Type

Description

is_secret

boolean

Make custom variable is secret or not. If the custom variable is secret, the value is not returned in the response payload.

name

string

The name of the variable. It corresponds with <CUSTOM_VARIABLE_NAME>. It must only contains upper-case characters, integers or underscores.

value

string

Value of the custom variable.

{
  "value": "variable-updated"
}

Réponse

OK

Custom variable for Webhook integration.

Expand All

Champ

Type

Description

is_secret [required]

boolean

Make custom variable is secret or not. If the custom variable is secret, the value is not returned in the response payload.

name [required]

string

The name of the variable. It corresponds with <CUSTOM_VARIABLE_NAME>. It must only contains upper-case characters, integers or underscores.

value

string

Value of the custom variable. It won't be returned if the variable is secret.

{
  "is_secret": true,
  "name": "CUSTOM_VARIABLE_NAME",
  "value": "CUSTOM_VARIABLE_VALUE"
}

Bad Request

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Authentication error

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Item Not Found

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                          # Path parameters
export custom_variable_name="CHANGE_ME"
# Curl command
curl -X PUT "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/${custom_variable_name}" \ -H "Accept: application/json" \ -H "Content-Type: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}" \ -d @- << EOF { "value": "variable-updated" } EOF
// Update a custom variable returns "OK" response

package main

import (
	"context"
	"encoding/json"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "webhook_custom_variable" in the system
	WebhookCustomVariableName := os.Getenv("WEBHOOK_CUSTOM_VARIABLE_NAME")

	body := datadogV1.WebhooksIntegrationCustomVariableUpdateRequest{
		Value: datadog.PtrString("variable-updated"),
	}
	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewWebhooksIntegrationApi(apiClient)
	resp, r, err := api.UpdateWebhooksIntegrationCustomVariable(ctx, WebhookCustomVariableName, body)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `WebhooksIntegrationApi.UpdateWebhooksIntegrationCustomVariable`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}

	responseContent, _ := json.MarshalIndent(resp, "", "  ")
	fmt.Fprintf(os.Stdout, "Response from `WebhooksIntegrationApi.UpdateWebhooksIntegrationCustomVariable`:\n%s\n", responseContent)
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Update a custom variable returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.WebhooksIntegrationApi;
import com.datadog.api.client.v1.model.WebhooksIntegrationCustomVariableResponse;
import com.datadog.api.client.v1.model.WebhooksIntegrationCustomVariableUpdateRequest;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    WebhooksIntegrationApi apiInstance = new WebhooksIntegrationApi(defaultClient);

    // there is a valid "webhook_custom_variable" in the system
    String WEBHOOK_CUSTOM_VARIABLE_NAME = System.getenv("WEBHOOK_CUSTOM_VARIABLE_NAME");

    WebhooksIntegrationCustomVariableUpdateRequest body =
        new WebhooksIntegrationCustomVariableUpdateRequest().value("variable-updated");

    try {
      WebhooksIntegrationCustomVariableResponse result =
          apiInstance.updateWebhooksIntegrationCustomVariable(WEBHOOK_CUSTOM_VARIABLE_NAME, body);
      System.out.println(result);
    } catch (ApiException e) {
      System.err.println(
          "Exception when calling WebhooksIntegrationApi#updateWebhooksIntegrationCustomVariable");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
"""
Update a custom variable returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.webhooks_integration_api import WebhooksIntegrationApi
from datadog_api_client.v1.model.webhooks_integration_custom_variable_update_request import (
    WebhooksIntegrationCustomVariableUpdateRequest,
)

# there is a valid "webhook_custom_variable" in the system
WEBHOOK_CUSTOM_VARIABLE_NAME = environ["WEBHOOK_CUSTOM_VARIABLE_NAME"]

body = WebhooksIntegrationCustomVariableUpdateRequest(
    value="variable-updated",
)

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = WebhooksIntegrationApi(api_client)
    response = api_instance.update_webhooks_integration_custom_variable(
        custom_variable_name=WEBHOOK_CUSTOM_VARIABLE_NAME, body=body
    )

    print(response)

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Update a custom variable returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::WebhooksIntegrationAPI.new

# there is a valid "webhook_custom_variable" in the system
WEBHOOK_CUSTOM_VARIABLE_NAME = ENV["WEBHOOK_CUSTOM_VARIABLE_NAME"]

body = DatadogAPIClient::V1::WebhooksIntegrationCustomVariableUpdateRequest.new({
  value: "variable-updated",
})
p api_instance.update_webhooks_integration_custom_variable(WEBHOOK_CUSTOM_VARIABLE_NAME, body)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Update a custom variable returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_webhooks_integration::WebhooksIntegrationAPI;
use datadog_api_client::datadogV1::model::WebhooksIntegrationCustomVariableUpdateRequest;

#[tokio::main]
async fn main() {
    // there is a valid "webhook_custom_variable" in the system
    let webhook_custom_variable_name = std::env::var("WEBHOOK_CUSTOM_VARIABLE_NAME").unwrap();
    let body =
        WebhooksIntegrationCustomVariableUpdateRequest::new().value("variable-updated".to_string());
    let configuration = datadog::Configuration::new();
    let api = WebhooksIntegrationAPI::with_config(configuration);
    let resp = api
        .update_webhooks_integration_custom_variable(webhook_custom_variable_name.clone(), body)
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Update a custom variable returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.WebhooksIntegrationApi(configuration);

// there is a valid "webhook_custom_variable" in the system
const WEBHOOK_CUSTOM_VARIABLE_NAME = process.env
  .WEBHOOK_CUSTOM_VARIABLE_NAME as string;

const params: v1.WebhooksIntegrationApiUpdateWebhooksIntegrationCustomVariableRequest =
  {
    body: {
      value: "variable-updated",
    },
    customVariableName: WEBHOOK_CUSTOM_VARIABLE_NAME,
  };

apiInstance
  .updateWebhooksIntegrationCustomVariable(params)
  .then((data: v1.WebhooksIntegrationCustomVariableResponse) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

DELETE https://api.ap1.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.datadoghq.eu/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.ddog-gov.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.us3.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/{custom_variable_name}

Présentation

Supprime l’endpoint <NOM_VARIABLE_PERSONNALISÉE>. This endpoint requires the manage_integrations permission.

Arguments

Paramètres du chemin

Nom

Type

Description

custom_variable_name [required]

string

The name of the custom variable.

Réponse

OK

Authentication error

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Item Not Found

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Too many requests

Error response object.

Expand All

Champ

Type

Description

errors [required]

[string]

Array of errors returned by the API.

{
  "errors": [
    "Bad Request"
  ]
}

Exemple de code

                  # Path parameters
export custom_variable_name="CHANGE_ME"
# Curl command
curl -X DELETE "https://api.ap1.datadoghq.com"https://api.datadoghq.eu"https://api.ddog-gov.com"https://api.datadoghq.com"https://api.us3.datadoghq.com"https://api.us5.datadoghq.com/api/v1/integration/webhooks/configuration/custom-variables/${custom_variable_name}" \ -H "Accept: application/json" \ -H "DD-API-KEY: ${DD_API_KEY}" \ -H "DD-APPLICATION-KEY: ${DD_APP_KEY}"
"""
Delete a custom variable returns "OK" response
"""

from os import environ
from datadog_api_client import ApiClient, Configuration
from datadog_api_client.v1.api.webhooks_integration_api import WebhooksIntegrationApi

# there is a valid "webhook_custom_variable" in the system
WEBHOOK_CUSTOM_VARIABLE_NAME = environ["WEBHOOK_CUSTOM_VARIABLE_NAME"]

configuration = Configuration()
with ApiClient(configuration) as api_client:
    api_instance = WebhooksIntegrationApi(api_client)
    api_instance.delete_webhooks_integration_custom_variable(
        custom_variable_name=WEBHOOK_CUSTOM_VARIABLE_NAME,
    )

Instructions

First install the library and its dependencies and then save the example to example.py and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" python3 "example.py"
# Delete a custom variable returns "OK" response

require "datadog_api_client"
api_instance = DatadogAPIClient::V1::WebhooksIntegrationAPI.new

# there is a valid "webhook_custom_variable" in the system
WEBHOOK_CUSTOM_VARIABLE_NAME = ENV["WEBHOOK_CUSTOM_VARIABLE_NAME"]
p api_instance.delete_webhooks_integration_custom_variable(WEBHOOK_CUSTOM_VARIABLE_NAME)

Instructions

First install the library and its dependencies and then save the example to example.rb and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" rb "example.rb"
// Delete a custom variable returns "OK" response

package main

import (
	"context"
	"fmt"
	"os"

	"github.com/DataDog/datadog-api-client-go/v2/api/datadog"
	"github.com/DataDog/datadog-api-client-go/v2/api/datadogV1"
)

func main() {
	// there is a valid "webhook_custom_variable" in the system
	WebhookCustomVariableName := os.Getenv("WEBHOOK_CUSTOM_VARIABLE_NAME")

	ctx := datadog.NewDefaultContext(context.Background())
	configuration := datadog.NewConfiguration()
	apiClient := datadog.NewAPIClient(configuration)
	api := datadogV1.NewWebhooksIntegrationApi(apiClient)
	r, err := api.DeleteWebhooksIntegrationCustomVariable(ctx, WebhookCustomVariableName)

	if err != nil {
		fmt.Fprintf(os.Stderr, "Error when calling `WebhooksIntegrationApi.DeleteWebhooksIntegrationCustomVariable`: %v\n", err)
		fmt.Fprintf(os.Stderr, "Full HTTP response: %v\n", r)
	}
}

Instructions

First install the library and its dependencies and then save the example to main.go and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" go run "main.go"
// Delete a custom variable returns "OK" response

import com.datadog.api.client.ApiClient;
import com.datadog.api.client.ApiException;
import com.datadog.api.client.v1.api.WebhooksIntegrationApi;

public class Example {
  public static void main(String[] args) {
    ApiClient defaultClient = ApiClient.getDefaultApiClient();
    WebhooksIntegrationApi apiInstance = new WebhooksIntegrationApi(defaultClient);

    // there is a valid "webhook_custom_variable" in the system
    String WEBHOOK_CUSTOM_VARIABLE_NAME = System.getenv("WEBHOOK_CUSTOM_VARIABLE_NAME");

    try {
      apiInstance.deleteWebhooksIntegrationCustomVariable(WEBHOOK_CUSTOM_VARIABLE_NAME);
    } catch (ApiException e) {
      System.err.println(
          "Exception when calling WebhooksIntegrationApi#deleteWebhooksIntegrationCustomVariable");
      System.err.println("Status code: " + e.getCode());
      System.err.println("Reason: " + e.getResponseBody());
      System.err.println("Response headers: " + e.getResponseHeaders());
      e.printStackTrace();
    }
  }
}

Instructions

First install the library and its dependencies and then save the example to Example.java and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" java "Example.java"
// Delete a custom variable returns "OK" response
use datadog_api_client::datadog;
use datadog_api_client::datadogV1::api_webhooks_integration::WebhooksIntegrationAPI;

#[tokio::main]
async fn main() {
    // there is a valid "webhook_custom_variable" in the system
    let webhook_custom_variable_name = std::env::var("WEBHOOK_CUSTOM_VARIABLE_NAME").unwrap();
    let configuration = datadog::Configuration::new();
    let api = WebhooksIntegrationAPI::with_config(configuration);
    let resp = api
        .delete_webhooks_integration_custom_variable(webhook_custom_variable_name.clone())
        .await;
    if let Ok(value) = resp {
        println!("{:#?}", value);
    } else {
        println!("{:#?}", resp.unwrap_err());
    }
}

Instructions

First install the library and its dependencies and then save the example to src/main.rs and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" cargo run
/**
 * Delete a custom variable returns "OK" response
 */

import { client, v1 } from "@datadog/datadog-api-client";

const configuration = client.createConfiguration();
const apiInstance = new v1.WebhooksIntegrationApi(configuration);

// there is a valid "webhook_custom_variable" in the system
const WEBHOOK_CUSTOM_VARIABLE_NAME = process.env
  .WEBHOOK_CUSTOM_VARIABLE_NAME as string;

const params: v1.WebhooksIntegrationApiDeleteWebhooksIntegrationCustomVariableRequest =
  {
    customVariableName: WEBHOOK_CUSTOM_VARIABLE_NAME,
  };

apiInstance
  .deleteWebhooksIntegrationCustomVariable(params)
  .then((data: any) => {
    console.log(
      "API called successfully. Returned data: " + JSON.stringify(data)
    );
  })
  .catch((error: any) => console.error(error));

Instructions

First install the library and its dependencies and then save the example to example.ts and run following commands:

    
DD_SITE="datadoghq.comus3.datadoghq.comus5.datadoghq.comdatadoghq.euap1.datadoghq.comddog-gov.com" DD_API_KEY="<API-KEY>" DD_APP_KEY="<APP-KEY>" tsc "example.ts"

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers