Enable Data Jobs Monitoring for Databricks

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Data Jobs Monitoring gives visibility into the performance and reliability of your Apache Spark and Databricks jobs.

Setup

Databricks Networking Restrictions can block some Datadog functions. Add the following Datadog IP ranges to your allow-list: webhook IPs, API IPs.

Follow these steps to enable Data Jobs Monitoring for Databricks.

  1. Configure the Datadog-Databricks integration for a Databricks workspace.
  2. Install the Datadog Agent on your Databricks cluster(s) in the workspace.

Configure the Datadog-Databricks integration

  1. In your Databricks workspace, click on your profile in the top right corner and go to Settings. Select Developer in the left side bar. Next to Access tokens, click Manage.

  2. Click Generate new token, enter “Datadog Integration” in the Comment field, remove the default value in Lifetime (days), and click Generate. Take note of your token.

    Important:

    • For the Datadog managed init script install (recommended), ensure the user or service principal linked to the token is a Workspace Admin.
    • For manual init script installation, ensure the user or service principal linked to the token has CAN VIEW access for the Databricks jobs and clusters you want to monitor.
    • Make sure you set the Lifetime (days) value to the maximum allowed (730 days) so that the token doesn’t expire and the integration doesn’t break.

    As an alternative, follow the official Databricks documentation to generate an access token for a service principal. The service principal must have the Workspace access entitlement enabled and the Workspace Admin or CAN VIEW access permissions as described above.

  3. In Datadog, open the Databricks integration tile.

  4. On the Configure tab, click Add Databricks Workspace.

  5. Enter a workspace name, your Databricks workspace URL, and the Databricks token you generated.

    In the Datadog-Databricks integration tile, a Databricks workspace is displayed. This workspace has a name, URL, and API token.

  6. In the Select products to set up integration section, make sure the Data Jobs Monitoring product is Enabled.

  7. In the Datadog Agent Setup section, choose either

Install the Datadog Agent

The Datadog Agent must be installed on Databricks clusters to monitor Databricks jobs that run on all-purpose or job clusters.

Datadog can install and manage a global init script in the Databricks workspace. The Datadog Agent is installed on all clusters in the workspace, when they start.

  • This setup does not work on Databricks clusters in Standard (formerly Shared) access mode, because global init scripts cannot be installed on those clusters. If you are using clusters with the Standard (formerly Shared) access mode, you must follow the instructions to Manually install on a specific cluster for installation on those specific clusters.
  • This install option, in which Datadog installs and manages your Datadog global init script, requires a Databricks Access Token with Workspace Admin permissions. A token with CAN VIEW access does not allow Datadog to manage the global init script of your Databricks account.

When integrating a workspace with Datadog

  1. In the Select products to set up integration section, make sure the Data Jobs Monitoring product is Enabled.

  2. In the Datadog Agent Setup section, select the Managed by Datadog toggle button.

  3. Click Select API Key to either select an existing Datadog API key or create a new Datadog API key.

  4. (Optional) Disable Enable Log Collection if you do not want to collect driver and worker logs for correlating with jobs.

  5. Click Save Databricks Workspace.

    In the Datadog-Databricks integration tile, Datadog Agent Setup when adding a Databricks workspace. Datadog can install and manage a global init script.

When adding the init script to a Databricks workspace already integrated with Datadog

  1. On the Configure tab, click the workspace in the list of workspaces

  2. Click the Configured Products tab

  3. Make sure the Data Jobs Monitoring product is Enabled.

  4. In the Datadog Agent Setup section, select the Managed by Datadog toggle button.

  5. Click Select API Key to either select an existing Datadog API key or create a new Datadog API key.

  6. (Optional) Disable Enable Log Collection if you do not want to collect driver and worker logs for correlating with jobs.

  7. Click Save Databricks Workspace at the bottom of the browser window.

    In the Datadog-Databricks integration tile, Datadog Agent Setup for a Databricks workspace already added to the integration. Datadog can install and manage a global init script.

Optionally, you can add tags to your Databricks cluster and Spark performance metrics by configuring the following environment variable in the Advanced Configuration section of your cluster in the Databricks UI or as Spark env vars with the Databricks API:

VariableDescription
DD_TAGSAdd tags to Databricks cluster and Spark performance metrics. Comma or space separated key:value pairs. Follow Datadog tag conventions. Example: env:staging,team:data_engineering
DD_ENVSet the env environment tag on metrics, traces, and logs from this cluster.
This setup does not work on Databricks clusters in Standard (formerly Shared) access mode, because global init scripts cannot be installed on those clusters. If you are using clusters with the Standard (formerly Shared) access mode, you must follow the instructions to Manually install on a specific cluster for installation on those specific clusters.
  1. In Databricks, click your display name (email address) in the upper right corner of the page.

  2. Select Settings and click the Compute tab.

  3. In the All purpose clusters section, next to Global init scripts, click Manage.

  4. Click Add. Name your script. Then, in the Script field, copy and paste the following script, remembering to replace the placeholders with your parameter values.

    #!/bin/bash
    
    # Required parameters
    export DD_API_KEY=<YOUR API KEY>
    export DD_SITE=<YOUR DATADOG SITE>
    export DATABRICKS_WORKSPACE="<YOUR WORKSPACE NAME>"
    
    # Download and run the latest init script
    curl -L https://install.datadoghq.com/scripts/install-databricks.sh > djm-install-script
    bash djm-install-script || true
    

    The script above sets the required parameters, and downloads and runs the latest init script for Data Jobs Monitoring in Databricks. If you want to pin your script to a specific version, you can replace the filename in the URL with install-databricks-0.12.9.sh to use version 0.12.9, for example. The source code used to generate this script, and the changes between script versions, can be found on the Datadog Agent repository.

  5. To enable the script for all new and restarted clusters, toggle Enabled.

    Databricks UI, admin settings, global init scripts. A script called 'install-datadog-agent' is in a list with an enabled toggle.
  6. Click Add.

Set the required init script parameters

Provide the values for the init script parameters at the beginning of the global init script.

export DD_API_KEY=<YOUR API KEY>
export DD_SITE=<YOUR DATADOG SITE>
export DATABRICKS_WORKSPACE="<YOUR WORKSPACE NAME>"

Optionally, you can also set other init script parameters and Datadog environment variables here, such as DD_ENV and DD_SERVICE. The script can be configured using the following parameters:

VariableDescriptionDefault
DD_API_KEYYour Datadog API key.
DD_SITEYour Datadog site.
DATABRICKS_WORKSPACEName of your Databricks Workspace. It should match the name provided in the Datadog-Databricks integration step. Enclose the name in double quotes if it contains whitespace.
DRIVER_LOGS_ENABLEDCollect spark driver logs in Datadog.false
WORKER_LOGS_ENABLEDCollect spark workers logs in Datadog.false
DD_TAGSAdd tags to Databricks cluster and Spark performance metrics. Comma or space separated key:value pairs. Follow Datadog tag conventions. Example: env:staging,team:data_engineering
DD_ENVSet the env environment tag on metrics, traces, and logs from this cluster.
  1. In Databricks, create a init script file in Workspace with the following content. Be sure to make note of the file path.

    #!/bin/bash
    
    # Download and run the latest init script
    curl -L https://install.datadoghq.com/scripts/install-databricks.sh > djm-install-script
    bash djm-install-script || true
    

    The script above downloads and runs the latest init script for Data Jobs Monitoring in Databricks. If you want to pin your script to a specific version, you can replace the filename in the URL with install-databricks-0.12.9.sh to use version 0.12.9, for example. The source code used to generate this script, and the changes between script versions, can be found on the Datadog Agent repository.

  2. On the cluster configuration page, click the Advanced options toggle.

  3. At the bottom of the page, go to the Init Scripts tab.

    Databricks UI, cluster configuration advanced options,  Init Scripts tab. A 'Destination' drop-down and an 'Init script path' file selector.
    • Under the Destination drop-down, select Workspace.
    • Under Init script path, enter the path to your init script.
    • Click Add.

Set the required init script parameters

  1. In Databricks, on the cluster configuration page, click the Advanced options toggle.

  2. At the bottom of the page, go to the Spark tab.

    Databricks UI, cluster configuration advanced options, Spark tab. A textbox titled 'Environment variables' contains values for DD_API_KEY and DD_SITE.

    In the Environment variables textbox, provide the values for the init script parameters.

    DD_API_KEY=<YOUR API KEY>
    DD_SITE=<YOUR DATADOG SITE>
    DATABRICKS_WORKSPACE="<YOUR WORKSPACE NAME>"
    

    Optionally, you can also set other init script parameters and Datadog environment variables here, such as DD_ENV and DD_SERVICE. The script can be configured using the following parameters:

VariableDescriptionDefault
DD_API_KEYYour Datadog API key.
DD_SITEYour Datadog site.
DATABRICKS_WORKSPACEName of your Databricks Workspace. It should match the name provided in the Datadog-Databricks integration step. Enclose the name in double quotes if it contains whitespace.
DRIVER_LOGS_ENABLEDCollect spark driver logs in Datadog.false
WORKER_LOGS_ENABLEDCollect spark workers logs in Datadog.false
DD_TAGSAdd tags to Databricks cluster and Spark performance metrics. Comma or space separated key:value pairs. Follow Datadog tag conventions. Example: env:staging,team:data_engineering
DD_ENVSet the env environment tag on metrics, traces, and logs from this cluster.
  1. Click Confirm.

Restart already-running clusters

The init script installs the Agent when clusters start.

Already-running all-purpose clusters or long-lived job clusters must be manually restarted for the init script to install the Datadog Agent.

For scheduled jobs that run on job clusters, the init script installs the Datadog Agent automatically on the next run.

Validation

In Datadog, view the Data Jobs Monitoring page to see a list of all your Databricks jobs.

Troubleshooting

If you don’t see any data in DJM after installing the product, follow those steps.

The init script installs the Datadog Agent. To make sure it is properly installed, ssh into the cluster and run the Agent status command:

sudo datadog-agent status

If the Agent is not installed, view the installation logs located in /tmp/datadog-djm-init.log.

If you need further assistance from Datadog support, add the following environment variable to the init script. This ensures that logs are sent to Datadog when a failure occurs.

export DD_DJM_ADD_LOGS_TO_FAILURE_REPORT=true

Advanced Configuration

Tag spans at runtime

You can set tags on Spark spans at runtime. These tags are applied only to spans that start after the tag is added.

// Add tag for all next Spark computations
sparkContext.setLocalProperty("spark.datadog.tags.key", "value")
spark.read.parquet(...)

To remove a runtime tag:

// Remove tag for all next Spark computations
sparkContext.setLocalProperty("spark.datadog.tags.key", null)

Aggregate cluster metrics from one-time job runs

This configuration is applicable if you want cluster resource utilization data about your jobs and create a new job and cluster for each run via the one-time run API endpoint (common when using orchestration tools outside of Databricks such as Airflow or Azure Data Factory).

If you are submitting Databricks Jobs through the one-time run API endpoint, each job run has a unique job ID. This can make it difficult to group and analyze cluster metrics for jobs that use ephemeral clusters. To aggregate cluster utilization from the same job and assess performance across multiple runs, you must set the DD_JOB_NAME variable inside the spark_env_vars of every new_cluster to the same value as your request payload’s run_name.

Here’s an example of a one-time job run request body:

{
   "run_name": "Example Job",
   "idempotency_token": "8f018174-4792-40d5-bcbc-3e6a527352c8",
   "tasks": [
      {
         "task_key": "Example Task",
         "description": "Description of task",
         "depends_on": [],
         "notebook_task": {
            "notebook_path": "/Path/to/example/task/notebook",
            "source": "WORKSPACE"
         },
         "new_cluster": {
            "num_workers": 1,
            "spark_version": "13.3.x-scala2.12",
            "node_type_id": "i3.xlarge",
            "spark_env_vars": {
               "DD_JOB_NAME": "Example Job"
            }
         }
      }
   ]
}

Set up Data Jobs Monitoring with Databricks Networking Restrictions

With Databricks Networking Restrictions, Datadog may not have access to your Databricks APIs, which is required to collect traces for Databricks job executions along with tags and other metadata.

If you are controlling Databricks API access with IP access lists, allow-listing Datadog’s specific webhook IP addresses allows Datadog to connect to the Databricks APIs in your workspace. See Databricks’s documentation for configuring IP access lists for workspaces to give Datadog API access.

If you are using Databricks Private Connectivity, reach out to the Datadog support team to discuss potential options.

Further Reading

Documentation, liens et articles supplémentaires utiles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers