Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

aws_efs_file_system

account_id

Type: STRING

availability_zone_id

Type: STRING
Provider name: AvailabilityZoneId
Description: The unique and consistent identifier of the Availability Zone in which the file system is located, and is valid only for One Zone file systems. For example, use1-az1 is an Availability Zone ID for the us-east-1 Amazon Web Services Region, and it has the same location in every Amazon Web Services account.

availability_zone_name

Type: STRING
Provider name: AvailabilityZoneName
Description: Describes the Amazon Web Services Availability Zone in which the file system is located, and is valid only for One Zone file systems. For more information, see Using EFS storage classes in the Amazon EFS User Guide.

creation_time

Type: TIMESTAMP
Provider name: CreationTime
Description: The time that the file system was created, in seconds (since 1970-01-01T00:00:00Z).

creation_token

Type: STRING
Provider name: CreationToken
Description: The opaque string specified in the request.

encrypted

Type: BOOLEAN
Provider name: Encrypted
Description: A Boolean value that, if true, indicates that the file system is encrypted.

file_system_arn

Type: STRING
Provider name: FileSystemArn
Description: The Amazon Resource Name (ARN) for the EFS file system, in the format arn:aws:elasticfilesystem:region:account-id:file-system/file-system-id . Example with sample data: arn:aws:elasticfilesystem:us-west-2:1111333322228888:file-system/fs-01234567

file_system_id

Type: STRING
Provider name: FileSystemId
Description: The ID of the file system, assigned by Amazon EFS.

file_system_protection

Type: STRUCT
Provider name: FileSystemProtection
Description: Describes the protection on the file system.

  • replication_overwrite_protection
    Type: STRING
    Provider name: ReplicationOverwriteProtection
    Description: The status of the file system’s replication overwrite protection.
    • ENABLED – The file system cannot be used as the destination file system in a replication configuration. The file system is writeable. Replication overwrite protection is ENABLED by default.
    • DISABLED – The file system can be used as the destination file system in a replication configuration. The file system is read-only and can only be modified by EFS replication.
    • REPLICATING – The file system is being used as the destination file system in a replication configuration. The file system is read-only and is only modified only by EFS replication.
    If the replication configuration is deleted, the file system’s replication overwrite protection is re-enabled, the file system becomes writeable.

kms_key_id

Type: STRING
Provider name: KmsKeyId
Description: The ID of an KMS key used to protect the encrypted file system.

life_cycle_state

Type: STRING
Provider name: LifeCycleState
Description: The lifecycle phase of the file system.

lifecycle_policies

Type: UNORDERED_LIST_STRUCT
Provider name: LifecyclePolicies
Description: An array of lifecycle management policies. EFS supports a maximum of one policy per file system.

  • transition_to_archive
    Type: STRING
    Provider name: TransitionToArchive
    Description: The number of days after files were last accessed in primary storage (the Standard storage class) files at which to move them to Archive storage. Metadata operations such as listing the contents of a directory don’t count as file access events.
  • transition_to_ia
    Type: STRING
    Provider name: TransitionToIA
    Description: The number of days after files were last accessed in primary storage (the Standard storage class) at which to move them to Infrequent Access (IA) storage. Metadata operations such as listing the contents of a directory don’t count as file access events.
  • transition_to_primary_storage_class
    Type: STRING
    Provider name: TransitionToPrimaryStorageClass
    Description: Whether to move files back to primary (Standard) storage after they are accessed in IA or Archive storage. Metadata operations such as listing the contents of a directory don’t count as file access events.

name

Type: STRING
Provider name: Name
Description: You can add tags to a file system, including a Name tag. For more information, see CreateFileSystem. If the file system has a Name tag, Amazon EFS returns the value in this field.

number_of_mount_targets

Type: INT32
Provider name: NumberOfMountTargets
Description: The current number of mount targets that the file system has. For more information, see CreateMountTarget.

owner_id

Type: STRING
Provider name: OwnerId
Description: The Amazon Web Services account that created the file system.

performance_mode

Type: STRING
Provider name: PerformanceMode
Description: The Performance mode of the file system.

provisioned_throughput_in_mibps

Type: DOUBLE
Provider name: ProvisionedThroughputInMibps
Description: The amount of provisioned throughput, measured in MiBps, for the file system. Valid for file systems using ThroughputMode set to provisioned.

size_in_bytes

Type: STRUCT
Provider name: SizeInBytes
Description: The latest known metered size (in bytes) of data stored in the file system, in its Value field, and the time at which that size was determined in its Timestamp field. The Timestamp value is the integer number of seconds since 1970-01-01T00:00:00Z. The SizeInBytes value doesn’t represent the size of a consistent snapshot of the file system, but it is eventually consistent when there are no writes to the file system. That is, SizeInBytes represents actual size only if the file system is not modified for a period longer than a couple of hours. Otherwise, the value is not the exact size that the file system was at any point in time.

  • timestamp
    Type: TIMESTAMP
    Provider name: Timestamp
    Description: The time at which the size of data, returned in the Value field, was determined. The value is the integer number of seconds since 1970-01-01T00:00:00Z.
  • value
    Type: INT64
    Provider name: Value
    Description: The latest known metered size (in bytes) of data stored in the file system.
  • value_in_archive
    Type: INT64
    Provider name: ValueInArchive
    Description: The latest known metered size (in bytes) of data stored in the Archive storage class.
  • value_in_ia
    Type: INT64
    Provider name: ValueInIA
    Description: The latest known metered size (in bytes) of data stored in the Infrequent Access storage class.
  • value_in_standard
    Type: INT64
    Provider name: ValueInStandard
    Description: The latest known metered size (in bytes) of data stored in the Standard storage class.

tags

Type: UNORDERED_LIST_STRING

throughput_mode

Type: STRING
Provider name: ThroughputMode
Description: Displays the file system’s throughput mode. For more information, see Throughput modes in the Amazon EFS User Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers