Azure CosmosDB for PostgreSQL

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Overview

Azure Cosmos DB for PostgreSQL is PostgreSQL extended with the power of “distributed tables.” This enables you to build highly scalable relational applications. Start building apps on a single node cluster, the same way you would with PostgreSQL. As your app’s scalability and performance requirements grow, you can seamlessly scale to multiple nodes by transparently distributing your tables.

Use the Datadog Azure integration to collect metrics and logs for Azure Cosmos DB for PostgreSQL. You can also utilize the out of the box dashboard for immediate insights.

Setup

Installation

If you haven’t already, set up the Microsoft Azure integration first. There are no other installation steps that need to be performed.

Data Collected

Metrics

azure.dbforpostgresql_servergroupsv2.active_connections
(gauge)
Active Connections.
azure.dbforpostgresql_servergroupsv2.apps_reserved_memory_percent
(gauge)
Percentage of Commit Memory Limit Reserved by Applications.
Shown as percent
azure.dbforpostgresql_servergroupsv2.cpu_percent
(gauge)
CPU percent.
Shown as percent
azure.dbforpostgresql_servergroupsv2.iops
(gauge)
IO operations per second.
azure.dbforpostgresql_servergroupsv2.memory_percent
(gauge)
Memory percent.
Shown as percent
azure.dbforpostgresql_servergroupsv2.network_bytes_egress
(count)
Network Out across active connections.
Shown as byte
azure.dbforpostgresql_servergroupsv2.network_bytes_ingress
(count)
Network In across active connections.
Shown as byte
azure.dbforpostgresql_servergroupsv2.storage_percent
(gauge)
Storage percent.
Shown as percent
azure.dbforpostgresql_servergroupsv2.storage_used
(gauge)
Storage used.
Shown as byte
azure.dbforpostgresql_servergroupsv2.vm_cached_bandwidth_percent
(gauge)
Percentage of cached disk bandwidth consumed by the VM.
Shown as percent
azure.dbforpostgresql_servergroupsv2.vm_cached_iops_percent
(gauge)
Percentage of cached disk IOPS consumed by the VM.
Shown as percent
azure.dbforpostgresql_servergroupsv2.vm_uncached_bandwidth_percent
(gauge)
Percentage of uncached disk bandwidth consumed by the VM.
Shown as percent
azure.dbforpostgresql_servergroupsv2.vm_uncached_iops_percent
(gauge)
Percentage of uncached disk IOPS consumed by the VM.
Shown as percent
azure.dbforpostgresql_servergroupsv2.count
(gauge)
Count of DBForPostgreSQL serverGroupsv2.

Events

The Azure Cosmos DB for PostgreSQL integration does not include any events.

Service Checks

The Azure Cosmos DB for PostgreSQL integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers