Microsoft Azure Data Lake Store

Section Overview

Azure Data Lake Store est une solution Data Lake sans limite qui améliore l’analytique Big Data.

Utilisez l’intégration Datadog/Azure pour recueillir les métriques de Data Lake Store.

Configuration

Installation

Si vous ne l’avez pas déjà fait, configurez d’abord l’intégration Microsoft Azure. Aucune autre procédure d’installation n’est requise.

Données collectées

Métriques

azure.datalakestore_accounts.data_read
(gauge)
Total amount of data read from the account.
Shown as byte
azure.datalakestore_accounts.data_written
(gauge)
Total amount of data written to the account.
Shown as byte
azure.datalakestore_accounts.read_requests
(count)
Count of data read requests to the account.
Shown as request
azure.datalakestore_accounts.total_storage
(gauge)
Total amount of data stored in the account.
Shown as byte
azure.datalakestore_accounts.write_requests
(count)
Count of data write requests to the account.
Shown as request
azure.datalakestore_accounts.count
(count)
Count of Datalake Store

Remarque: cette intégration permet uniquement la collecte de métriques pour Data Lake Storage Gen1. Data Lake Storage Gen2 étant basé sur Azure Blob Storage, les métriques associées peuvent être visualisées sur Datadog en définissant l’espace de nommage Blob Storage suivant : azure.storage_storageaccounts_blobservices.*. Pour en savoir plus, consultez la documentation sur Azure Data Lake Storage Gen2.

Événements

L’intégration Azure Data Lake Store n’inclut aucun événement.

Checks de service

L’intégration Azure Data Lake Store n’inclut aucun check de service.

Dépannage

Besoin d’aide ? Contactez l’assistance Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers