Stockage File d'attente Microsoft Azure

Section Overview

Stockage File d’attente Azure est un service qui vous permet de stocker un grand nombre de messages afin de pouvoir y accéder où que vous soyez par l’intermédiaire d’appels authentifiés, à l’aide du protocole HTTP ou HTTPS.

Recueillez des métriques de Stockage File d’attente Azure pour :

  • Visualiser les performances de votre stockage de file d’attente
  • Corréler les performances de votre stockage de file d’attente avec vos applications

Configuration

Installation

Si vous ne l’avez pas déjà fait, configurez d’abord l’intégration Microsoft Azure. Aucune autre procédure d’installation n’est requise.

Données collectées

Métriques

azure.storage_storageaccounts_queueservices.availability
(gauge)
Percentage of availability for the storage service or the specified API operation. Availability is calculated by taking the TotalBillableRequests value and dividing it by the number of applicable requests, including those that produced unexpected errors. All unexpected errors result in reduced availability for the storage service or the specified API operation.
Shown as percent
azure.storage_storageaccounts_queueservices.egress
(count)
Amount of egress data. This number includes egress to external clients from Azure Storage as well as egress within Azure. As a result, this number does not reflect billable egress.
Shown as byte
azure.storage_storageaccounts_queueservices.ingress
(count)
Amount of ingress data, in bytes. This number includes ingress from an external client into Azure Storage as well as ingress within Azure.
Shown as byte
azure.storage_storageaccounts_queueservices.queue_capacity
(gauge)
Amount of queue storage used by the storage account.
Shown as byte
azure.storage_storageaccounts_queueservices.queue_count
(gauge)
Number of queues in the storage account.
azure.storage_storageaccounts_queueservices.queue_message_count
(gauge)
Number of unexpired queue messages in the storage account.
azure.storage_storageaccounts_queueservices.success_e2_e_latency
(gauge)
Average end-to-end latency of successful requests made to a storage service or the specified API operation, in milliseconds. This value includes the required processing time within Azure Storage to read the request, send the response, and receive acknowledgment of the response.
Shown as millisecond
azure.storage_storageaccounts_queueservices.success_server_latency
(gauge)
Average time used to process a successful request by Azure Storage. This value does not include the network latency specified in SuccessE2ELatency.
Shown as millisecond
azure.storage_storageaccounts_queueservices.transactions
(count)
Number of requests made to a storage service or the specified API operation. This number includes successful and failed requests, as well as requests which produced errors. Use the ResponseType dimension for the number of different types of responses.
azure.storage_storageaccounts_queueservices.count
(gauge)
Count of Storage storageAccounts queueServices.

Événements

L’intégration Stockage File d’attente Azure n’inclut aucun événement.

Checks de service

L’intégration Stockage File d’attente Azure n’inclut aucun check de service.

Dépannage

Besoin d’aide ? Contactez l’assistance Datadog.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers