OCI Network Firewall

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Overview

OCI Network Firewall is a managed firewall service that offers intrusion detection and prevention for your Virtual Cloud Network (VCN). It provides advanced security features to monitor and control network traffic, ensuring robust protection against cyber threats.

This integration allows you to monitor your firewall’s health, capacity, and performance by collecting metrics and tags from the oci_network_firewall namespace.

Setup

Installation

Once you set up the Oracle Cloud Infrastructure integration, ensure that any namespaces mentioned above are included in your Connector Hub.

Data Collected

Metrics

oci.network_firewall.byte_received_count
(count)
The number of bytes received through the firewall.
Shown as byte
oci.network_firewall.byte_sent_count
(count)
The number of bytes sent through the firewall.
Shown as byte
oci.network_firewall.decryption_rule_hit_count
(count)
The number of times a connection matches a decryption rule.
oci.network_firewall.icmp_fragment_attacks_count
(count)
The number of ICMP fragment attacks detected.
oci.network_firewall.ip_spoof_count
(count)
Number of IP spoof attacks detected.
oci.network_firewall.land_attacks_count
(count)
The number of land attacks detected.
oci.network_firewall.mac_spoof_count
(count)
The number of MAC spoof attacks detected.
oci.network_firewall.packet_drop_count
(count)
The number of packets dropped through the firewall.
Shown as packet
oci.network_firewall.packet_received_count
(count)
The number of packets received at the firewall from the network, after drops.
Shown as packet
oci.network_firewall.packet_received_in_error_count
(count)
Number of packets received through the firewall that have errors.
Shown as packet
oci.network_firewall.packet_sent_count
(count)
The number of packets sent from the firewall to the network, after drops.
Shown as packet
oci.network_firewall.ping_of_death_attacks_count
(count)
The number of ping of death attacks detected.
oci.network_firewall.security_rule_hit_count
(count)
The number of times a connection matches a security rule.
oci.network_firewall.teardrop_attacks_count
(count)
The number of teardrop attacks detected.

Service Checks

OCI Network Firewall does not include any service checks.

Events

OCI Network Firewall does not include any events.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers