Riak CS

Supported OS Linux Mac OS Windows

Intégration2.9.0

Dashboard Riak CS

Présentation

Enregistrez vos métriques Riak CS dans Datadog pour :

  • Visualiser les métriques clés de Riak CS
  • Corréler les performances de Riak CS avec le reste de vos applications

Configuration

Installation

Le check RiakCS est inclus avec le package de l’Agent Datadog : vous n’avez donc rien d’autre à installer sur vos nœuds RiakCS.

Configuration

  1. Modifiez le fichier riakcs.d/conf.yaml dans le dossier conf.d/ à la racine du répertoire de configuration de votre Agent. Consultez le fichier d’exemple riakcs.d/conf.yaml pour découvrir toutes les options de configuration disponibles :

    init_config:
    
    instances:
      ## @param access_id - string - required
      ## Enter you RiakCS access key.
      #
      - access_id: "<ACCESS_KEY>"
    
        ## @param access_secret - string - required
        ## Enter the corresponding RiakCS access secret.
        #
        access_secret: "<ACCESS_SECRET>"
    
  2. Redémarrez l’Agent.

Validation

Lancez la sous-commande status de l’Agent et cherchez riakcs dans la section Checks.

Données collectées

Métriques

riakcs.block_delete.latency_mean
(gauge)
Mean latency of BLOCK DELETE operations performed
Shown as microsecond
riakcs.block_delete.meter_rate
(gauge)
Rate of BLOCK DELETE operations performed
Shown as operation
riakcs.block_get.latency_mean
(gauge)
Mean latency of BLOCK GET operations performed
Shown as microsecond
riakcs.block_get.meter_rate
(gauge)
Rate of BLOCK GET operations performed
Shown as operation
riakcs.block_put.latency_mean
(gauge)
Mean latency of BLOCK PUT operations performed
Shown as microsecond
riakcs.block_put.meter_rate
(gauge)
Rate of BLOCK PUT operations performed
Shown as operation
riakcs.bucket_create.latency_mean
(gauge)
Mean latency of BUCKET CREATE operations performed
Shown as microsecond
riakcs.bucket_create.meter_rate
(gauge)
Rate of BUCKET CREATE operations performed
Shown as operation
riakcs.bucket_delete.latency_mean
(gauge)
Mean latency of BUCKET DELETE operations performed
Shown as microsecond
riakcs.bucket_delete.meter_rate
(gauge)
Rate of BUCKET DELETE operations performed
Shown as operation
riakcs.object_delete.latency_mean
(gauge)
Mean latency of DELETE operations performed
Shown as microsecond
riakcs.object_delete.meter_rate
(gauge)
Rate of DELETE operations performed
Shown as operation
riakcs.object_get.latency_mean
(gauge)
Mean latency of GET operations performed
Shown as microsecond
riakcs.object_get.meter_rate
(gauge)
Rate of GET operations performed
Shown as operation
riakcs.object_put.latency_mean
(gauge)
Mean latency of PUT operations performed
Shown as microsecond
riakcs.object_put.meter_rate
(gauge)
Rate of PUT operations performed
Shown as operation
riakcs.service_get_buckets.latency_mean
(gauge)
Mean latency of GET BUCKETS operations performed
Shown as microsecond
riakcs.service_get_buckets.meter_rate
(gauge)
Rate of GET BUCKETS operations performed
Shown as operation
La plupart des métriques d’API S3 sont incluses, ainsi que des statistiques relatives à la mémoire. Certaines ont été exclues :

  • bucketacl(get|put)
  • objectacl(get|put)
  • bucketpolicy(get|put|delete)
  • in(one|total)
  • time_error*
  • _time_100

Il est possible d’ajouter toutes les métriques exclues ainsi que plus de 1 000 métriques supplémentaires au fichier de configuration riakcs.d/conf.yaml à l’aide de la clé metrics dans instance_config. La valeur de cette clé doit être définie sur une liste de noms de métrique.

Consultez la liste complète des métriques disponibles.

Événements

Le check RiakCS n’inclut aucun événement.

Checks de service

riakcs.can_connect
Renvoie CRITICAL si l’Agent n’est pas capable de se connecter à l’instance KyotoTycoon qu’il surveille. Si ce n’est pas le cas, renvoie OK.
Statuses: ok, critical

Dépannage

Besoin d’aide ? Contactez l’assistance Datadog.

Pour aller plus loin

Documentation, liens et articles supplémentaires utiles :

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers