Riak CS

Supported OS Linux Mac OS Windows

통합 버전4.3.0

RiakCS 대시보드

개요

Datadog에서 RiakCS 메트릭을 캡처하면 다음이 가능합니다.

  • 핵심 RiakCS 메트릭 시각화
  • RiakCS 성능을 나머지 애플리케이션과 연계

설정

설치

RiakCS 점검은 Datadog 에이전트 패키지에 포함되어 있으므로 RiakCS 노드에 아무 것도 설치할 필요가 없습니다.

구성

  1. 에이전트 설정 디렉터리 루트에 있는 conf.d/ 폴더에서 riakcs.d/conf.yaml 파일을 편집하세요. 사용 가능한 모든 설정 옵션은 샘플 riakcs.d/conf.yaml을 참조하세요.

    init_config:
    
    instances:
      ## @param access_id - string - required
      ## Enter you RiakCS access key.
      #
      - access_id: "<ACCESS_KEY>"
    
        ## @param access_secret - string - required
        ## Enter the corresponding RiakCS access secret.
        #
        access_secret: "<ACCESS_SECRET>"
    
  2. Agent를 재시작합니다.

검증

에이전트의 status 하위 명령을 실행하여 점검 섹션에서 riakcs를 찾습니다.

수집한 데이터

메트릭

riakcs.block_delete.latency_mean
(gauge)
Mean latency of BLOCK DELETE operations performed
Shown as microsecond
riakcs.block_delete.meter_rate
(gauge)
Rate of BLOCK DELETE operations performed
Shown as operation
riakcs.block_get.latency_mean
(gauge)
Mean latency of BLOCK GET operations performed
Shown as microsecond
riakcs.block_get.meter_rate
(gauge)
Rate of BLOCK GET operations performed
Shown as operation
riakcs.block_put.latency_mean
(gauge)
Mean latency of BLOCK PUT operations performed
Shown as microsecond
riakcs.block_put.meter_rate
(gauge)
Rate of BLOCK PUT operations performed
Shown as operation
riakcs.bucket_create.latency_mean
(gauge)
Mean latency of BUCKET CREATE operations performed
Shown as microsecond
riakcs.bucket_create.meter_rate
(gauge)
Rate of BUCKET CREATE operations performed
Shown as operation
riakcs.bucket_delete.latency_mean
(gauge)
Mean latency of BUCKET DELETE operations performed
Shown as microsecond
riakcs.bucket_delete.meter_rate
(gauge)
Rate of BUCKET DELETE operations performed
Shown as operation
riakcs.object_delete.latency_mean
(gauge)
Mean latency of DELETE operations performed
Shown as microsecond
riakcs.object_delete.meter_rate
(gauge)
Rate of DELETE operations performed
Shown as operation
riakcs.object_get.latency_mean
(gauge)
Mean latency of GET operations performed
Shown as microsecond
riakcs.object_get.meter_rate
(gauge)
Rate of GET operations performed
Shown as operation
riakcs.object_put.latency_mean
(gauge)
Mean latency of PUT operations performed
Shown as microsecond
riakcs.object_put.meter_rate
(gauge)
Rate of PUT operations performed
Shown as operation
riakcs.service_get_buckets.latency_mean
(gauge)
Mean latency of GET BUCKETS operations performed
Shown as microsecond
riakcs.service_get_buckets.meter_rate
(gauge)
Rate of GET BUCKETS operations performed
Shown as operation
메모리 통계를 포함한 대부분의 S3 API 메트릭을 포함합니다. 일부 메트릭이 제외되었습니다.

  • bucketacl(get|put)
  • objectacl(get|put)
  • bucketpolicy(get|put|delete)
  • in(one|total)
  • time_error*
  • _time_100

제외된 메트릭 또는 추가 메트릭(1000개 이상)을 instance_configmetrics 키를 사용해 riakcs.d/conf.yaml 설정 파일에 추가할 수 있습니다. 값은 메트릭 이름의 목록이어야 합니다.

사용 가능한 메트릭 전체 목록을 참조하세요.

이벤트

RiakCS 점검은 이벤트를 포함하지 않습니다.

서비스 점검

riakcs.can_connect
Returns CRITICAL if the Agent is unable to connect to the monitored KyotoTycoon instance. Returns OK otherwise.
Statuses: ok, critical

트러블슈팅

도움이 필요하신가요? Datadog 고객 지원팀에 문의해주세요.

참고 자료

기타 유용한 문서, 링크 및 기사:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers