Datadog Logs Destination

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Use Observability Pipelines’ Datadog Logs destination to send logs to Datadog Log Management.

Setup

Set up the Datadog Logs destination and its environment variables when you set up a pipeline. The information below is configured in the pipelines UI.

Set up the destination

Observability Pipelines compresses logs with the gzip (level 6) algorithm.

There are no configuration steps for your Datadog destination.

Set the environment variables

No environment variables required.

How the destination works

Event batching

A batch of events is flushed when one of these parameters is met. See event batching for more information.

Max EventsMax BytesTimeout (seconds)
1,0004,250,0005
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers