Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Code Security is not available for the site.

Overview

Static Code Analysis is Datadog’s Static Application Security Testing (SAST) capability. SAST is a clear-box software testing technique that analyzes a program’s pre-production code without the need to execute the program.

Static Code Analysis helps you identify security vulnerabilities and maintainability issues early in the software development life cycle (SDLC) to ensure only the highest quality, most secure code makes it to production. It provides organizations with the following benefits:

  • Applications are less vulnerable to security breaches over time, due to new vulnerabilities being caught through SAST scans before code reaches production.
  • Takes the guesswork out of adhering to an organization’s code standards, enabling your development team to ship compliant code without significant impacts to developer velocity.
  • Onboard developers faster because Static Code Analysis enables an organization to maintain a more readable codebase over time.

Set up Static Code Analysis

Static Code Analysis supports scanning for security vulnerabilities and poor coding practices in the following languages and technologies:

python
javascript
typescript
java
c sharp

go
ruby
php
docker
yaml

kotlin
terraform
other

Scans can run via your CI/CD pipelines or directly in Datadog with hosted scanning (GitHub-only). To get started, go to the Code Security setup page or see the Setup documentation.

Integrate into the development lifecycle

Source code management

During code reviews on GitHub, Datadog can automatically flag Static Code Analysis violations in pull requests by adding inline review comments on the relevant line(s) of code. When applicable, Datadog also provides suggested fixes that can be applied directly in the pull request. You can also open a pull request directly from Datadog to fix a vulnerability or quality issue.


IDEs

You can identify code vulnerabilities in real time as you edit a file in your Integrated Development Environment (IDE). See integration-specific documentation for more information:


Search and filter results

After setting up Static Code Analysis, a scan is ran upon each commit to a scanned repository. Violations are summarized per repository on the Code Security Repositories page. Click on a repository to analyze Code Vulnerabilities and Code Quality results from Static Code Analysis.

To filter your results, use the facets to the left of the list, or search. Results can be filtered by service or team facets. For more information about how results are linked to Datadog services and teams, see Getting Started with Code Security.

Every row represents a violation. Each violation is associated with the specific commit and branch that is selected in the filters at the top of the page (by default, results are shown for the latest commit on the default branch of the repository you are viewing).

Click on a violation to open a side panel that contains information about the scope of the violation and where it originated.

The content of the violation is shown in tabs:

  • Details: A description of the violation and the lines of code that caused it. To see the offending code snippet, configure the Datadog GitHub App.
  • Remediation: One or more code fixes that can resolve the violation, with options for remediation.
  • Event: JSON metadata regarding the violation.

Customize your configuration

To customize which Static Code Analysis rules are configured in your repositories or across your organization, see the Setup documentation.

Datadog associates code and library scan results with relevant services by using the following mechanisms:

  1. Identifying the code location associated with a service using the Software Catalog.
  2. Detecting usage patterns of files within additional Datadog products.
  3. Searching for the service name in the file path or repository.

If one method succeeds, no further mapping attempts are made. Each mapping method is detailed below.

Identifying the code location in the Software Catalog

The schema version v3 and later of the Software Catalog allows you to add the mapping of your code location for your service. The codeLocations section specifies the location of the repository containing the code and its associated paths.

The paths attribute is a list of globs that should match paths in the repository.

entity.datadog.yaml

apiVersion: v3
kind: service
metadata:
name: my-service
datadog:
codeLocations:
- repositoryURL: https://github.com/myorganization/myrepo.git
paths:
- path/to/service/code/**

Remediation

Apply suggested fixes

In Datadog Static Code Analysis, there are two types of suggested fixes:

  1. Deterministic Suggested Fix: For simple violations like linting issues, the rule analyzer automatically provides templated fixes.
  2. AI-suggested Fix: For complex violations, fixes are typically not available beforehand. Instead, you can use AI-suggested Fixes, which use OpenAI’s GPT-4 to generate a suggested fix. You can choose between “Text” and “Unified Diff” fixes, which outputs plain text instructions or a code change for resolving the violation, respectively. This feature is opt-in.

Fix a vulnerability or quality issue directly from Datadog

You can push a code change to fix an issue found by Static Code Analysis directly from a result in Datadog in two ways.

Open a pull request

If your GitHub app’s Pull Requests permission is set to Read & Write, one-click remediation is enabled for all Static Code Analysis findings with an available suggested fix. For more information about setting up the GitHub integration, see GitHub Pull Requests.

Follow these steps to fix a vulnerability and open a pull request:

  1. View a specific SAST result in Code Security.
  2. Click Fix Violation in the side panel of the result.
  3. Select Open a Pull Request.
  4. Enter a pull request title and commit message.
  5. Click Create PR.

Commit directly to the current branch

You can also fix a vulnerability by committing directly to the branch the result was found on.

To commit a suggested fix:

  1. View a specific SAST result in Code Security.
  2. Click Fix Violation in the side panel of the result.
  3. Click Commit to current branch.

Report false positives

If you believe a specific violation is a false positive, you can flag it as a false positive with a reason for flagging, which sends a report directly to Datadog. Submissions are reviewed on a regular basis to improve ruleset quality over time.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers