Backup recovery points should be encrypted at rest

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

This control ensures that AWS Backup recovery points are encrypted at rest, passing only if encryption is enabled.

An AWS Backup recovery point is a saved snapshot of your data at a specific time. Encrypting these recovery points enhances security, guarding against unauthorized access.

Remediation

For instructions on encrypting an AWS Backup recovery point, see Encryption for backups in AWS Backup in the AWS Backup Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers