Network ACLs should enforce outbound traffic restrictions

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Investigate AWS Network Access Control Lists (NACLs) for rules that utilize multiple ports and limit outbound traffic access to a specific port range.

Rationale

Eliminate the threat of unauthorized access by setting a specified port range.

Remediation

From the console

Follow the Adding and deleting rules docs to limit ingress traffic access based on port range.

From the command line

  1. Run replace-network-acl-entry to create a rule that sets a specific port range for egress traffic.

    replace-network-acl-entry.sh

        aws ec2 replace-network-acl-entry
            --network-acl-id id-01234567
            --egress
            --rule-number 02
            --protocol tcp
            --port-range From=000,To=000
            --rule-action allow
        
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers