Network Firewall logging should be enabled

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

This control verifies whether at least one type of logging is enabled for an AWS Network Firewall.

Enabling logging is essential for ensuring the reliability, availability, and performance of your firewalls. AWS Network Firewall logging provides detailed insights into network traffic, including timestamps of when the stateful engine processed a packet flow, detailed packet flow information, and any actions taken by stateful rules against the packet flow.

Remediation

For guidance on configuring firewall logging, please refer to the Updating a firewall’s logging configuration section of the AWS Network Firewall Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers