Server parameter 'log_retention_days' should be greater than 3 days for PostgreSQL Database Server

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Enabling log_retention_days helps PostgreSQL Database to set the number of days a log file is retained, which in turn generates query and error logs. Query and error logs can be used to identify, troubleshoot, and repair configuration errors and sub-optimal performance.

Remediation

From the console

  1. Log in to Azure Portal.
  2. Go to Azure Database for PostgreSQL server.
  3. For each database, click Server parameters.
  4. Search for log_retention_days.
  5. Enter a value in range 4-7 (inclusive) and save.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers