PingFederate Admin Alert: impossible travel by user

This rule is part of a beta feature. To learn more, contact Support.
Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Goal

Detect unusual logs from different geo locations made by a single user.

Strategy

The Impossible Travel detection type’s algorithm compares the GeoIP data of the last log and the current log to determine if the user {{@usr.name}} traveled more than 500km at over 1,000km/h. This detection rule aims to identify potential threats early, allowing for timely investigation and mitigation to protect server resources and maintain service availability.

Triage and response

  1. Investigate the source user {{@usr.name}} with requests from different geo-locations from {{@impossible_travel.triggering_locations.first_location.city}}, {{@impossible_travel.triggering_locations.first_location.country}} and {{@impossible_travel.triggering_locations.second_location.city}}, {{@impossible_travel.triggering_locations.second_location.country}}.
  2. Implement immediate measures to block or limit the impact of the suspicious activity if confirmed as a threat.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers