Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Goal

Detect a brute force attack on a Snowflake user.

Strategy

To determine a successful attempt: Detect when the same user fails to login five times and then successfully logs in. This generates a MEDIUM severity signal.

To determine an unsuccessful attempt: Detect when the same user fails to login ten times. This generates an INFO severity signal.

Triage and response

  1. Inspect the logs to see if this was a valid login attempt.
  2. See if 2FA was authenticated.
  3. If the user was compromised, rotate user credentials.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers