Impossible travel scenario observed in Wiz authentication

This rule is part of a beta feature. To learn more, contact Support.

Set up the wiz integration.

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Goal

Detect an Impossible Travel event within Wiz authentication.

Strategy

The Impossible Travel detection type’s algorithm compares the GeoIP data of the last log and the current log to determine if the user (@usr.email) traveled more than 500km at over 1,000km/h.

Triage and response

  1. Determine if {{@usr.email}} should be connecting from {{@impossible_travel.triggering_locations.first_location.city}}, {{@impossible_travel.triggering_locations.first_location.country}} and {{@impossible_travel.triggering_locations.second_location.city}}, {{@impossible_travel.triggering_locations.second_location.country}} in a short period of time.
  2. If the user should not be connecting from {{@impossible_travel.triggering_locations.first_location.city}}, {{@impossible_travel.triggering_locations.first_location.country}} or {{@impossible_travel.triggering_locations.second_location.city}}, {{@impossible_travel.triggering_locations.second_location.country}}, then consider isolating the account and resetting their credentials.
  3. Use the Cloud SIEM - User Investigation dashboard to audit any user actions that may have occurred after the illegitimate login.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers