Configure Libreswan to use System Crypto Policy

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Crypto Policies provide a centralized control over crypto algorithms usage of many packages. Libreswan is supported by system crypto policy, but the Libreswan configuration may be set up to ignore it.

To check that Crypto Policies settings are configured correctly, ensure that the /etc/ipsec.conf includes the appropriate configuration file. In /etc/ipsec.conf, make sure that the following line is not commented out or superseded by later includes: include /etc/crypto-policies/back-ends/libreswan.config

Rationale

Overriding the system crypto policy makes the behavior of the Libreswan service violate expectations, and makes system configuration more fragmented.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

function remediate_libreswan_crypto_policy() {
    CONFIG_FILE="/etc/ipsec.conf"
    if ! grep -qP "^\s*include\s+/etc/crypto-policies/back-ends/libreswan.config\s*(?:#.*)?$" "$CONFIG_FILE" ; then
        # the file might not end with a new line
        echo -e '\ninclude /etc/crypto-policies/back-ends/libreswan.config' >> "$CONFIG_FILE"
    fi
    return 0
}

remediate_libreswan_crypto_policy

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Configure Libreswan to use System Crypto Policy
  lineinfile:
    path: /etc/ipsec.conf
    line: include /etc/crypto-policies/back-ends/libreswan.config
    create: true
  tags:
  - NIST-800-53-CM-6(a)
  - NIST-800-53-MA-4(6)
  - NIST-800-53-SC-12(2)
  - NIST-800-53-SC-12(3)
  - NIST-800-53-SC-13
  - PCI-DSS-Req-2.2
  - configure_libreswan_crypto_policy
  - high_severity
  - low_complexity
  - low_disruption
  - no_reboot_needed
  - restrict_strategy
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers