Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

To properly set the permissions of /etc/shadow, run the command:

$ sudo chmod 0640 /etc/shadow

Rationale

The /etc/shadow file contains the list of local system accounts and stores password hashes. Protection of this file is critical for system security. Failure to give ownership of this file to root provides the designated owner with access to sensitive information which could weaken the system security posture.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

chmod u-xs,g-xws,o-xwrt /etc/shadow

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Test for existence /etc/shadow
  stat:
    path: /etc/shadow
  register: file_exists
  tags:
  - CJIS-5.5.2.2
  - NIST-800-53-AC-6(1)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.7.c
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - configure_strategy
  - file_permissions_etc_shadow
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed

- name: Ensure permission u-xs,g-xws,o-xwrt on /etc/shadow
  file:
    path: /etc/shadow
    mode: u-xs,g-xws,o-xwrt
  when: file_exists.stat is defined and file_exists.stat.exists
  tags:
  - CJIS-5.5.2.2
  - NIST-800-53-AC-6(1)
  - NIST-800-53-CM-6(a)
  - PCI-DSS-Req-8.7.c
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - configure_strategy
  - file_permissions_etc_shadow
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers