Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

By removing the gdm3 package, the system no longer has GNOME installed installed. If X Windows is not installed then the system cannot boot into graphical user mode. This prevents the system from being accidentally or maliciously booted into a graphical.target mode. To do so, run the following command:

$ sudo apt remove gdm3

Rationale

Unnecessary service packages must not be installed to decrease the attack surface of the system. A graphical environment is unnecessary for certain types of systems including a virtualization hypervisor.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}\n' 'gdm3' 2>/dev/null | grep -q installed; then

# CAUTION: This remediation script will remove gdm3
#	   from the system, and may remove any packages
#	   that depend on gdm3. Execute this
#	   remediation AFTER testing on a non-production
#	   system!

DEBIAN_FRONTEND=noninteractive apt-get remove -y "gdm3"

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - disable_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - package_gdm_removed

- name: Ensure gdm3 is removed
  package:
    name: gdm3
    state: absent
  when: '"gdm3" in ansible_facts.packages'
  tags:
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - disable_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - package_gdm_removed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers