Set configuration for loopback traffic

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Configure the loopback interface to accept traffic. Configure all other interfaces to deny traffic to the loopback network.

Rationale

Loopback traffic is generated between processes on machine and is typically critical to operation of the system. The loopback interface is the only place that loopback network traffic should be seen, all other interfaces should ignore traffic on this network as an anti-spoofing measure.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if ( ! ( dpkg-query --show --showformat='${db:Status-Status}\n' 'nftables' 2>/dev/null | grep -q installed ) && ! ( dpkg-query --show --showformat='${db:Status-Status}\n' 'ufw' 2>/dev/null | grep -q installed ) && dpkg-query --show --showformat='${db:Status-Status}\n' 'iptables' 2>/dev/null | grep -q installed ); then

iptables -A INPUT -i lo -j ACCEPT
iptables -A OUTPUT -o lo -j ACCEPT
iptables -A INPUT -s 127.0.0.0/8 -j DROP

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - PCI-DSS-Req-1.3
  - PCI-DSSv4-1.4
  - PCI-DSSv4-1.4.1
  - medium_severity
  - set_loopback_traffic

- name: Allow incoming traffic on the loopback interface
  ansible.builtin.iptables:
    chain: INPUT
    in_interface: lo
    jump: ACCEPT
  when: ( not ( "nftables" in ansible_facts.packages ) and not ( "ufw" in ansible_facts.packages
    ) and "iptables" in ansible_facts.packages )
  tags:
  - PCI-DSS-Req-1.3
  - PCI-DSSv4-1.4
  - PCI-DSSv4-1.4.1
  - medium_severity
  - set_loopback_traffic

- name: Allow outgoing traffic on the loopback interface
  ansible.builtin.iptables:
    chain: OUTPUT
    out_interface: lo
    jump: ACCEPT
  when: ( not ( "nftables" in ansible_facts.packages ) and not ( "ufw" in ansible_facts.packages
    ) and "iptables" in ansible_facts.packages )
  tags:
  - PCI-DSS-Req-1.3
  - PCI-DSSv4-1.4
  - PCI-DSSv4-1.4.1
  - medium_severity
  - set_loopback_traffic

- name: Drop incoming traffic from the localhost
  ansible.builtin.iptables:
    chain: INPUT
    source: 127.0.0.0/8
    jump: DROP
  when: ( not ( "nftables" in ansible_facts.packages ) and not ( "ufw" in ansible_facts.packages
    ) and "iptables" in ansible_facts.packages )
  tags:
  - PCI-DSS-Req-1.3
  - PCI-DSSv4-1.4
  - PCI-DSSv4-1.4.1
  - medium_severity
  - set_loopback_traffic

Warning

Changing firewall settings while connected over network can result in being locked out of the system.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers