Use Only Strong Key Exchange algorithms

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Limit the Key Exchange to strong algorithms. The following line in /etc/ssh/sshd_config demonstrates use of those:

KexAlgorithms curve25519-sha256,curve25519-sha256@libssh.org,ecdh-sha2-nistp256,ecdh-sha2-nistp384,ecdh-sha2-nistp521,diffie-hellman-group-exchange-sha256,diffie-hellman-group16-sha512,diffie-hellman-group18-sha512,diffie-hellman-group14-sha256
        

Rationale

Key exchange is any method in cryptography by which cryptographic keys are exchanged between two parties, allowing use of a cryptographic algorithm. If the sender and receiver wish to exchange encrypted messages, each must be equipped to encrypt messages to be sent and decrypt messages received

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}
' 'kernel' 2>/dev/null | grep -q installed; then

sshd_strong_kex='curve25519-sha256,curve25519-sha256@libssh.org,ecdh-sha2-nistp256,ecdh-sha2-nistp384,ecdh-sha2-nistp521,diffie-hellman-group-exchange-sha256,diffie-hellman-group16-sha512,diffie-hellman-group18-sha512,diffie-hellman-group14-sha256'


if [ -e "/etc/ssh/sshd_config" ] ; then
    
    LC_ALL=C sed -i "/^\s*KexAlgorithms\s\+/Id" "/etc/ssh/sshd_config"
else
    touch "/etc/ssh/sshd_config"
fi
# make sure file has newline at the end
sed -i -e '$a\' "/etc/ssh/sshd_config"

cp "/etc/ssh/sshd_config" "/etc/ssh/sshd_config.bak"
# Insert at the beginning of the file
printf '%s\n' "KexAlgorithms $sshd_strong_kex" > "/etc/ssh/sshd_config"
cat "/etc/ssh/sshd_config.bak" >> "/etc/ssh/sshd_config"
# Clean up after ourselves.
rm "/etc/ssh/sshd_config.bak"

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - PCI-DSS-Req-2.3
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.7
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sshd_use_strong_kex
- name: XCCDF Value sshd_strong_kex # promote to variable
  set_fact:
    sshd_strong_kex: !!str curve25519-sha256,curve25519-sha256@libssh.org,ecdh-sha2-nistp256,ecdh-sha2-nistp384,ecdh-sha2-nistp521,diffie-hellman-group-exchange-sha256,diffie-hellman-group16-sha512,diffie-hellman-group18-sha512,diffie-hellman-group14-sha256
  tags:
    - always

- name: Use Only Strong Key Exchange algorithms
  block:

  - name: Check for duplicate values
    lineinfile:
      path: /etc/ssh/sshd_config
      create: true
      regexp: (?i)(?i)^\s*KexAlgorithms\s+
      state: absent
    check_mode: true
    changed_when: false
    register: dupes

  - name: Deduplicate values from /etc/ssh/sshd_config
    lineinfile:
      path: /etc/ssh/sshd_config
      create: true
      regexp: (?i)(?i)^\s*KexAlgorithms\s+
      state: absent
    when: dupes.found is defined and dupes.found > 1

  - name: Insert correct line to /etc/ssh/sshd_config
    lineinfile:
      path: /etc/ssh/sshd_config
      create: true
      regexp: (?i)(?i)^\s*KexAlgorithms\s+
      line: KexAlgorithms {{ sshd_strong_kex }}
      state: present
      insertbefore: BOF
      validate: /usr/sbin/sshd -t -f %s
  when: '"kernel" in ansible_facts.packages'
  tags:
  - PCI-DSS-Req-2.3
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.7
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sshd_use_strong_kex
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers