Ensure Users Re-Authenticate for Privilege Escalation - sudo !authenticate

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

The sudo !authenticate option, when specified, allows a user to execute commands using sudo without having to authenticate. This should be disabled by making sure that the !authenticate option does not exist in /etc/sudoers configuration file or any sudo configuration snippets in /etc/sudoers.d/.

Rationale

Without re-authentication, users may access resources or perform tasks for which they do not have authorization.

When operating systems provide the capability to escalate a functional capability, it is critical that the user re-authenticate.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

for f in /etc/sudoers /etc/sudoers.d/* ; do
  if [ ! -e "$f" ] ; then
    continue
  fi
  matching_list=$(grep -P '^(?!#).*[\s]+\!authenticate.*$' $f | uniq )
  if ! test -z "$matching_list"; then
    while IFS= read -r entry; do
      # comment out "!authenticate" matches to preserve user data
      sed -i "s/^${entry}$/# &/g" $f
    done <<< "$matching_list"

    /usr/sbin/visudo -cf $f &> /dev/null || echo "Fail to validate $f with visudo"
  fi
done

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Find /etc/sudoers.d/ files
  ansible.builtin.find:
    paths:
    - /etc/sudoers.d/
  register: sudoers
  tags:
  - NIST-800-53-CM-6(a)
  - NIST-800-53-IA-11
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sudo_remove_no_authenticate

- name: Remove lines containing !authenticate from sudoers files
  ansible.builtin.replace:
    regexp: (^(?!#).*[\s]+\!authenticate.*$)
    replace: '# \g<1>'
    path: '{{ item.path }}'
    validate: /usr/sbin/visudo -cf %s
  with_items:
  - path: /etc/sudoers
  - '{{ sudoers.files }}'
  tags:
  - NIST-800-53-CM-6(a)
  - NIST-800-53-IA-11
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sudo_remove_no_authenticate
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers